A plug-in iron tower foundation casting mold and construction method
A technology of iron tower foundation and construction method, which is applied in the field of iron tower foundation, can solve the problems that two people can fix one in two days, time-consuming and laborious, and lead screw breakage, etc., and achieve the effect of easy disassembly, improved firmness, and easy adjustment
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0017] In order to make the purpose, features and advantages of the present invention more obvious and understandable, the technical solutions protected by the present invention will be clearly and completely described below using specific embodiments and accompanying drawings. Obviously, the implementation described below Examples are only some embodiments of the present invention, but not all embodiments. Based on the embodiments in this patent, all other embodiments obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of this patent.
[0018] This embodiment provides a plug-in iron tower foundation casting mold, such as figure 1 with figure 2 As shown, including: four screw bodies 1;
[0019] The lead screw body 1 includes: a lead screw 2 and a square loading and unloading part 3; the square loading and unloading part 3 is provided with a fixed surface 5 and a through hole 4 vertically arranged with the fixed surface ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 

