A configuration method for energy storage station capacity and charging and discharging power adapting to peak shaving and valley filling
A technology of charging and discharging power, shaving peaks and filling valleys, applied in circuit devices, AC network circuits, AC network load balancing and other directions, can solve problems such as the blank of constant capacity work, increase rationality, avoid waste of resources, and simple calculation methods Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0029] A method for configuring the capacity and charging and discharging power of an energy storage station adapted to peak shaving and valley filling, the method comprising the following steps:
[0030] a. Obtain the 24-hour typical load characteristic curve of the area to be built of the energy storage station through the power operation department;
[0031] b. Determine the charge and discharge state quantity of the energy storage station as S charge , S charge =1 means the energy storage station is in charging state, S charge =0 means that the energy storage station is in the state of floating charge, S charge =-1 means that the energy storage station is in a discharge state, which can be described by the following mathematical formula:
[0032]
[0033] In the formula, P load is the load power, P av is the average load power, S oc is the state of charge of the load, S oc·min and S oc·max Respectively refer to the maximum and minimum state of charge of the ener...
Embodiment 2
[0043] A method for configuring the capacity and charging and discharging power of an energy storage station adapted to peak shaving and valley filling, the method comprising the following steps:
[0044] Step 1: Obtain the load characteristic data of the area to be built of the energy storage station. Through the local power department, the typical load characteristic curve of the 24-point system is obtained as follows: figure 1 shown.
[0045]Step 2: Determine the charging and discharging status of the energy storage station to be built. According to the 24-hour load characteristics of the area in step 1, the 24-hour load average power is calculated in units of hours, which is recorded as P av , it is easy to obtain P av =106.08kW, the data has been marked in figure 1 middle.
[0046] In order to achieve the purpose of peak shifting and valley filling of the energy storage station, the charging and discharging time of the energy storage station is defined as: when the l...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


