Bricking type municipal administration integrated pipeline channel and construction method thereof
A comprehensive pipeline and municipal technology, applied in artificial islands, water conservancy projects, infrastructure projects, etc., can solve problems such as confusion, inconsistency, waste, etc., to avoid re-excavation and damage, convenient and quick cleaning and maintenance, and save labor and material effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0037] Such as figure 1 and 3 As shown in -7, the brick-built comprehensive municipal pipeline channel of the present embodiment 1 includes a U-shaped prefabricated plate 1 and a prefabricated cover plate 2, and two water retaining plates 22 are arranged below the prefabricated cover plate 2 to prevent garbage from entering the pipeline. , Also prevent rainwater from directly showering the pipeline, and one side of the water retaining plate 22 is provided with a positioning plate 23 to prevent the water retaining plate 22 from shifting.
[0038] The U-shaped prefabricated panel 1 includes a plain concrete cushion 3, which is a plane, and the plain concrete cushion 3 is provided with two parallel brick walls 4, and the outer layer of the brick walls 4 is coated with waterproof cement Mortar layer13.
[0039] A certain space is formed between the two brick walls 4, the outside of the brick walls 4 is provided with backfill soil 5, and the inner wall of the brick walls 4 is pro...
Embodiment 2
[0044] Such as figure 2 As shown, the plain concrete cushion 3 in the present embodiment 2 is U-shaped, and the U-shaped cavity is the sedimentation cleaning well 2 .
[0045] Other components and their connections in Embodiment 2 are common knowledge in the art, and will not be repeated here.
[0046] The construction method of the brick-built municipal comprehensive pipeline channel of present embodiment 1 and 2 comprises the following steps:
[0047] (1) Determine the location of pipelines and pipeline wells on the road according to unified planning and design requirements;
[0048] (2) Excavate the foundation trench, level and compact it to the design elevation and slope;
[0049] (3) Pour the plain concrete cushion and maintain it;
[0050] (4) Build brick walls and paint the waterproof cement mortar layer, and pre-buy the adjustable support base during the masonry, and the distance between the supports shall not be greater than 1500mm;
[0051] (5) After curing, bac...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com