Unlock instant, AI-driven research and patent intelligence for your innovation.

A Calculation Method of Collecting Abnormal Maintenance Duration

A calculation method and time duration technology, applied in the field of abnormal maintenance duration calculation, can solve problems such as inability to solve problems in a timely and rapid manner, affecting users' normal power consumption, and low fault handling efficiency, achieving efficient troubleshooting and ensuring human resource allocation. , The effect of high efficiency of fault handling

Active Publication Date: 2020-04-10
STATE GRID ZHEJIANG ELECTRIC POWER +2
View PDF8 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

At present, the on-site fault handling in the collection operation and maintenance work cannot accurately plan the duration, and the procedures and methods of personnel with different operation and maintenance capabilities are also quite different in handling faults. It is impossible to guarantee optimal fault handling, and it is impossible to reasonably conduct operation and maintenance personnel The distribution of faults leads to low efficiency of fault handling and failure to solve problems in a timely and fast manner, which in turn leads to an increase in operation and maintenance costs and affects the normal power consumption of users.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A Calculation Method of Collecting Abnormal Maintenance Duration
  • A Calculation Method of Collecting Abnormal Maintenance Duration
  • A Calculation Method of Collecting Abnormal Maintenance Duration

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0066] In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.

[0067] On the contrary, the invention covers any alternatives, modifications, equivalent methods and schemes within the spirit and scope of the invention as defined by the claims. Further, in order to make the public have a better understanding of the present invention, some specific details are described in detail in the detailed description of the present invention below. The present invention can be fully understood by those skilled in the art without the description of these detailed parts.

[0068] Such as figure 1 As shown, a method for calculating the duration of abnormal collection mainte...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a method for calculating collection abnormality maintenance time, and belongs to the technical field of power equipment, which aims at solving the problems of low fault treatment rate and failure to timely and quickly solve due to inaccurate time planning of site fault treatment in the collection operation and maintenance work. The maintenance time of abnormality fault points is separated into route time and site maintenance time; aiming at the route time, the factors of distance between abnormality fault point and operation and maintenance site, transportation tools, site maintenance time of abnormality faults and the like need to be comprehensively considered, and an abnormality fault point treatment time model under different conditions is established. The method has the advantages that each basic work and operation step are scientifically divided in details, and the time is estimated, the site maintenance time is more accurately pre-estimated, the site fault treatment is processized, the reasonable labor resource distribution is guaranteed, and the fault treatment efficiency is high.

Description

technical field [0001] The invention relates to a calculation method for collecting abnormal maintenance time, and belongs to the technical field of electric equipment. Background technique [0002] Since 2010, Guodian Corporation has comprehensively promoted the electricity consumption information collection system (hereinafter referred to as the "collection system"). With the gradual completion of full coverage of collection work, the focus of collection work is gradually shifting from system construction to system operation and maintenance. In order to ensure the safe, stable, reliable and efficient operation of the collection system, it is necessary to standardize the operation and maintenance of the collection system, strengthen the closed-loop management of the operation and maintenance of the collection system, and improve the application level of the collection system. How to achieve efficient processing of on-site collection failures and reasonably arrange the work...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): G01C21/34G01R31/00
CPCG01C21/3446G01C21/3453G01R31/00
Inventor 徐川子陆欢华唐健毅严俊周慧明宣玉华江硕李熊
Owner STATE GRID ZHEJIANG ELECTRIC POWER