Public building participated grid optimization operation method

A technology for optimizing operation and buildings, applied in the parallel feeding arrangement of single network, wind power generation, photovoltaic power generation, etc., it can solve the problem of single research on flexible resource optimization control technology, lack of complementary characteristics research of adjustable resources, and less analysis of optimization combination model, etc. problems, to achieve the effect of optimizing power grid operation, reducing peak-to-valley difference, and reducing load curve fluctuations

Inactive Publication Date: 2017-05-24
江苏新智合电力技术有限公司 +1
View PDF1 Cites 8 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, research on flexible and schedulable resources such as air-conditioning loads, lighting loads, electric vehicles, distributed energy, and energy storage in public buildings focuses on air-conditioning load forecasting, unilateral control of lighting, and research on charging and discharging models for electric vehicles. The research on the optimization control technology of flexible resources in the scenario is relatively single, mainly focusing on the improvement of building energy efficiency, less consideration is given to multi-objective scenarios such as the interaction between building and power grid demand, lack of research on complementary characteristics between adjustable resources, and less analysis of optimal combination models

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Public building participated grid optimization operation method
  • Public building participated grid optimization operation method
  • Public building participated grid optimization operation method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0030] In order to clearly understand the technical solution of the present invention, its detailed structure will be proposed in the following description. Obviously, the specific implementation of the embodiments of the present invention is not limited to the special details familiar to those skilled in the art. The preferred embodiments of the present invention are described in detail below, and there may be other implementations besides those described in detail.

[0031] The present invention will be described in further detail below in conjunction with the accompanying drawings and embodiments.

[0032] combine Figure 1-Figure 4 , the control decision-making module selects three different control and optimization modes during the power grid optimization operation period according to the set threshold value judgment according to the control command issued by the superior and the real-time monitoring data (optimization mode 1, optimization Mode 2 and optimization mode 3...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a public building participated grid optimization operation method. The grid optimization operation method comprises the steps of S1, building a public building adjustable resource optimization operation control information base, wherein the information base contains all adjustable resources such as photovoltaic cells, wind power generation, EV and adjustable loads in public buildings; S2, establishing an adjustable resource optimization operation mode, and sending the adjustable resource optimization operation mode to the adjustable resources in the buildings, wherein the ith adjustable resource receives the notification and judges whether the optimization operation mode is allowed to be accepted or not; and S3, if not, updating the information base according to constraint conditions, if so, judging whether a multi-objective optimization objective is met or not, if so, performing an optimization operation according to the mode, and if not, continuing to update the information base according to the constraint conditions. Fluctuations of an output building overall load curve are enabled to be greatly reduced, an optimized load area is stable, and the difference between peak and valley is also obviously reduced.

Description

technical field [0001] The invention relates to the technical field of power grid operation, in particular to a method for public buildings to participate in power grid optimization operation. Background technique [0002] Energy conservation and emission reduction is a national strategic policy, and it is the only way to develop a low-carbon economy and maintain sustainable development of the national economy. As the power source of the national economy and the core element of the national energy strategy, electricity is the lifeblood of the national economy and the key areas and main force of energy conservation and emission reduction. With the sustained and rapid development of my country's economy and the increasingly prominent structural contradictions, the peak load of the power grid continues to rise, and the peak-to-valley difference of the power grid shows a trend of gradually expanding. Safe and stable operation of the power system. In particular, public buildings...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): H02J3/38H02J3/46
CPCH02J3/002H02J3/383H02J3/386H02J3/46Y02B10/10Y02E10/56Y02E10/76
Inventor 焦赞锋徐青山焦筱悛
Owner 江苏新智合电力技术有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products