Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Intelligent construction worker management system and method integrating BIM (building information modeling) and RFID (radio frequency identification)

An intelligent management system and technology for construction workers, applied in the field of construction worker management, can solve the problems of limited effect, high personnel mobility, and low management efficiency, and achieve the effect of improving efficiency and effect, and being simple and convenient to use.

Inactive Publication Date: 2017-05-31
NANJING CONSTR ENG GRP
View PDF4 Cites 35 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

At present, the management of construction workers mainly relies on the supervision and investigation of managers, but due to factors such as limited experience and energy of managers, complex construction site conditions, and high mobility of personnel, the management efficiency of traditional management methods is not high, and limited effect

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Intelligent construction worker management system and method integrating BIM (building information modeling) and RFID (radio frequency identification)
  • Intelligent construction worker management system and method integrating BIM (building information modeling) and RFID (radio frequency identification)
  • Intelligent construction worker management system and method integrating BIM (building information modeling) and RFID (radio frequency identification)

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0026] Embodiment 1: see figure 1 , figure 2 , an intelligent management system for construction workers integrating BIM RFID, the management system includes a safety helmet 1, an RFID reader 2, an audible and visual alarm 3, an LED display 4 and a computer 5, wherein an RFID label is attached to the safety helmet,

[0027] The RFID reader 2 is connected to the computer 5 in a wired manner;

[0028] The RFID reader 2 is connected with the sound and light alarm 3 in a wired manner;

[0029] The RFID reader 2 is connected to the LED display 4 in a wired manner;

[0030] The management system can read the information in the RFID tag in the safety helmet worn by the construction worker through the RFID reader, thereby realizing the identification of the construction worker, the management of the area access authority, the measurement of working hours, the intelligent positioning, and the safety reminder functions, and Summarize and visualize the data in the BIM model;

[0031...

Embodiment 2

[0036] Example 2: see Figure 1-Figure 5 , an intelligent management method for construction workers with RFID integrated with BIM, the method is as follows: construction workers enter the construction site, RFID reader 2 reads the information in the RFID tag in the worker's helmet, and compares the reading result with the system preset The list of workers is compared and displayed on the LED display, and then the data is aggregated to the computer background, so as to realize the identification and attendance functions of construction workers; when the RFID reader reads that the construction worker has access to the area Or when the worker's access information exists in the preset access list of the RFID reader, the worker is allowed to enter the construction area; Summarize, so as to realize the management function of construction workers' area access rights; after the RFID readers located at the entrances and exits of special work areas such as the entrances and exits of el...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an intelligent construction worker management system and method integrating BIM (building information modeling) and RFID (radio frequency identification). The system comprises a helmet with an RFID tag, an RFID reader, a computer, an LED display and a sound and light alarm. The system can read information in the RFID tag in the helmet worn by a construction worker through the RFID reader and summarize the information into the background for analysis and processing, so that functions of identification, regional access right management, labor hour measurement, intelligent positioning and security warning of the construction worker are realized, and data can also be summarized and displayed visually in a BIM module. The system integrates a variety of functions, is lower in cost and convenient to use, can effectively improve management efficiency and effect of the construction worker and has a very good marketing value.

Description

technical field [0001] The invention relates to a construction worker intelligent management system integrated with BIM and RFID, and belongs to the technical field of construction worker management. Background technique [0002] Modern engineering tends to be large-scale and complex, and the phenomenon of frequent safety accidents on construction sites and chaotic management of workers' organizations is becoming more and more serious. At present, the management of construction workers mainly relies on the supervision and investigation of managers, but due to factors such as limited experience and energy of managers, complex construction site conditions, and high mobility of personnel, the management efficiency of traditional management methods is not high, and The effect is limited. Therefore, in the field of construction worker management, there is an urgent need for a set of active, efficient and intelligent construction worker management systems and methods. At the sam...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/06G06Q50/08G06K17/00
CPCG06K17/00G06Q10/06311G06Q50/08
Inventor 鲁开明马国鑫韩豫
Owner NANJING CONSTR ENG GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products