Weekly work task management method and weekly work task management system based on power grid dispatching
A technology of work tasks and management methods, applied in the field of power grid dispatching management automation, can solve problems such as untimely work reporting, difficulty in grasping the work progress status of managers, and inconvenient access to work history records.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0012] The present invention will be described in further detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here can be used to explain the present invention, but not to limit the present invention.
[0013] (1) Input the basic information of system operation, including work type, unit and personnel authority;
[0014] (2) Input dispatch center work, information includes:
[0015] Job number: Generated automatically by adding 1 to the number of the current job type, and can also be manually modified;
[0016] Leading unit: choose from the list of units, generally there is only one leading unit, or there can be more than one;
[0017] Matching unit: choose from the unit list, there can be multiple units or none;
[0018] End Date: The time when the work plan ends.
[0019] (3) After the staff log in to the system, they directly enter the job browsing map, and the job browsing map page ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 

