A method for determining the transformer taps in the initial operation of a chain power grid
A technology for transformer taps and determination methods, which is applied in the field of power systems and can solve problems such as less analysis of actual power grid characteristics
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0052] Taking the library-A-Ba-Ka power transmission and transformation project in the southern Xinjiang power grid as an example, this principle is used to determine the location of its taps. This method is applied to the determination of the 750kV transformer taps of the Kuabaka power transmission and transformation project in the southern Xinjiang power grid, as follows:
[0053] Such as figure 2 As shown, it is estimated that from September to the end of 2015, the 750 kV Kuqa-Aksu-Bachu-Kashgar Power Transmission and Transformation Project will be put into operation. , 1,000 kilometers of 750 kV lines are all single lines, and the connection with the main network is weak. The transformers of the 750kV substations in southern Xinjiang are no-load tap-changing transformers. There are five taps to choose from on the 220kV side, that is, 220kV±2×2.5%.
[0054] The power grid in southern Xinjiang has long lines, light power flow, serious excess reactive power, and overvoltag...