Building waste breaking treatment device

A technology for processing equipment and construction waste, applied in the field of waste crushing and processing equipment, can solve problems such as easy occurrence of a large amount of dust, impact on the surrounding environment, time-consuming and labor-intensive problems

Inactive Publication Date: 2017-07-18
李海兵
View PDF6 Cites 10 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] In order to overcome the shortcomings of time-consuming and labor-intensive work and low work efficiency when manually crushing construction waste, and in the process of crushing, a large amount of dust is prone to appear, thereby affecting the surrounding environment. The technical problem to be solved by the present invention is to provide a Time-saving and labor-saving, high work efficiency, dust is not easy to appear during the crushing process, and the construction waste crushing treatment equipment that does not affect the surrounding environment

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Building waste breaking treatment device
  • Building waste breaking treatment device
  • Building waste breaking treatment device

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0030] A kind of construction waste crushing processing equipment, such as Figure 1-6 As shown, it includes a base plate 1, a slide rail 2, a slide block 3, a crushing frame 4, a top plate 5, a crushing block 6, a crushing device 7 and a pushing device 8, and the slide rail 2 is installed in the middle of the top of the base plate 1 through bolt connection. The slide rail 2 is provided with a sliding block 3 matched with it, the top of the sliding block 3 is connected with a crushing frame 4 by means of bolts, and the top right side of the bottom plate 1 is provided with a pushing device 8, and the pushing part of the pushing device 8 is connected with the right sliding block. 3. The left side is connected, the top plate 5 is set above the bottom plate 1, and the crushing device 7 is set on the right side of the bottom of the top plate 5. The moving part of the crushing device 7 is connected with a crushing block 6, and the crushing block 6 is located directly above the crushi...

Embodiment 2

[0032] A kind of construction waste crushing processing equipment, such as Figure 1-6 As shown, it includes a base plate 1, a slide rail 2, a slide block 3, a crushing frame 4, a top plate 5, a crushing block 6, a crushing device 7 and a pushing device 8, and the slide rail 2 is installed in the middle of the top of the base plate 1 through bolt connection. The slide rail 2 is provided with a sliding block 3 matched with it, the top of the sliding block 3 is connected with a crushing frame 4 by means of bolts, and the top right side of the bottom plate 1 is provided with a pushing device 8, and the pushing part of the pushing device 8 is connected with the right sliding block. 3. The left side is connected, the top plate 5 is set above the bottom plate 1, and the crushing device 7 is set on the right side of the bottom of the top plate 5. The moving part of the crushing device 7 is connected with a crushing block 6, and the crushing block 6 is located directly above the crushi...

Embodiment 3

[0035] A kind of construction waste crushing processing equipment, such as Figure 1-6 As shown, it includes a base plate 1, a slide rail 2, a slide block 3, a crushing frame 4, a top plate 5, a crushing block 6, a crushing device 7 and a pushing device 8, and the slide rail 2 is installed in the middle of the top of the base plate 1 through bolt connection. The slide rail 2 is provided with a sliding block 3 matched with it, the top of the sliding block 3 is connected with a crushing frame 4 by means of bolts, and the top right side of the bottom plate 1 is provided with a pushing device 8, and the pushing part of the pushing device 8 is connected with the right sliding block. 3. The left side is connected, the top plate 5 is set above the bottom plate 1, and the crushing device 7 is set on the right side of the bottom of the top plate 5. The moving part of the crushing device 7 is connected with a crushing block 6, and the crushing block 6 is located directly above the crushi...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to waste crushing and processing equipment, in particular to construction waste crushing and processing equipment. The technical problem to be solved by the present invention is to provide a construction waste crushing and processing equipment that saves time and labor, has high working efficiency, is not prone to dust during the crushing process, and does not affect the surrounding environment. In order to solve the above technical problems, the present invention provides such a construction waste crushing and processing equipment, which includes a bottom plate, a slide rail, a slider, a crushing frame, a top plate, a crushing block, etc.; , There is a sliding block on the slide rail, the crushing frame is installed on the top of the sliding block by bolt connection, and the pushing device is installed on the right side of the top of the bottom plate. The invention can completely crush the construction waste through the up and down movement of the crushing block and the left and right movement of the crushing frame, and water can be sprayed out through the nozzle to make the construction waste wet with water.

Description

technical field [0001] The invention relates to waste crushing and processing equipment, in particular to construction waste crushing and processing equipment. Background technique [0002] Architecture is the general term for buildings and structures, and it is an artificial environment created by people using the material and technological means they have mastered, and using certain scientific laws, feng shui concepts, and aesthetic principles to meet the needs of social life. [0003] After the construction of the building is completed, there will always be construction waste. If the construction waste is directly discarded, it is too wasteful of resources. After the construction waste is broken, it can be used for other purposes. When the construction waste is broken manually, it is time-consuming and laborious, and the work efficiency is low. During the crushing process, a large amount of dust is prone to appear, which will affect the surrounding environment. Therefore,...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): B02C19/00B02C23/18B02C23/00
CPCB02C19/00B02C23/00B02C23/18
Inventor 李海兵
Owner 李海兵
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products