Prefabricated wall integrated with mechanical and electrical pipelines and construction method thereof

A prefabricated, electric pipeline technology, applied to walls, building components, buildings, etc., can solve the problems of building boards waste, affect the appearance, and cannot be reused, so as to save building materials, reduce the impact of openings, and improve assembly construction efficiency Effect

Pending Publication Date: 2017-07-18
上海市建工设计研究总院有限公司 +1
View PDF5 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] In the field of prefabricated buildings, traditionally adopt the prefabricated construction mode of first civil assembly and then electromechanical installation. During the construction and installation of electromechanical pipelines, holes are often made on the completed civil works. Opening holes will not only affect the appearance, but also require a large amount of The time will reduce the efficiency of building assembly and construction
[0003] In addition, the existing prefabricated walls are usually fixed with concrete, and cannot be moved at will, changed positions, and cannot be reused, which is not only inconvenient to use, but also causes waste of building boards

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Prefabricated wall integrated with mechanical and electrical pipelines and construction method thereof
  • Prefabricated wall integrated with mechanical and electrical pipelines and construction method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0026] The present invention will be described in further detail below in conjunction with the accompanying drawings and specific embodiments. Advantages and features of the present invention will be apparent from the following description and claims. The technical content and features of the present invention will be described in detail below by referring to the accompanying drawings. It should be further noted that all the drawings are in very simplified form and use imprecise scales, and are only used to facilitate and clearly assist the purpose of illustrating the embodiments of the present invention. For the convenience of description, the "up" and "down" described below are consistent with the directions of up and down in the drawings, but this should not be a limitation of the technical solution of the present invention.

[0027] see Figure 1 to Figure 2 , this embodiment discloses a prefabricated wall body integrating electromechanical pipelines, including: a main b...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides a prefabricated wall integrated with mechanical and electrical pipelines and a construction method thereof. The wall comprises a main wall body; the upper end and the lower end of the main wall body are in sliding connection with an upper layer floorboard and a lower layer floorboard through an upper connecting piece and a lower connecting piece correspondingly; end plates used for being fixedly connected with the floorboards are arranged at the ends, away from the main wall body, of the upper connecting piece and the lower connecting piece; the ends, facing the main wall body, of the upper connecting piece and the lower connecting piece are each provided with a convex rail; the upper end and the lower end of the main wall body are provided with grooves matched with the corresponding convex rails; and the main wall body can move relative to the floorboards along the upper connecting piece and the lower connecting piece, and main pipeline grooves or a main pipeline groove are / is pre-buried in the upper connecting piece and / or the lower connecting piece. On the one hand, the civil engineering and mechanical-electrical integrated prefabricated wall can be achieved, punching influences of mechanical and electrical pipeline construction on civil engineering can be reduced to a great extent, and the prefabrication construction efficiency is improved. On the other hand, free moving and splicing of the prefabricated wall can be achieved, and the wall can be recycled.

Description

technical field [0001] The invention relates to the field of assembled buildings, in particular to an assembled wall with integrated electromechanical pipelines and a construction method thereof. Background technique [0002] In the field of prefabricated buildings, traditionally adopt the prefabricated construction mode of first civil assembly and then electromechanical installation. During the construction and installation of electromechanical pipelines, holes are often made on the completed civil works. Opening holes will not only affect the appearance, but also require a large amount of The time will reduce the assembly construction efficiency of the building. [0003] In addition, the existing prefabricated walls are usually fixed with concrete, and cannot be moved at will, changed positions, and cannot be reused, which is not only inconvenient to use, but also causes waste of building boards. [0004] Therefore, how to provide a prefabricated wall with integrated elec...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E04B2/74E04B2/82
CPCE04B2/74E04B2/82E04B2/827E04B2002/7488
Inventor 郎卫国张栋鹏王红兵陈晓明贾宝荣龚明马良
Owner 上海市建工设计研究总院有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products