26results about How to "Save building materials" patented technology

Hexagonal prefabricated composite heat preservation formwork

The utility model discloses a hexagonal prefabricated composite heat preservation template, which belongs to the technical field of heat preservation templates, and is characterized in that the whole template unit is in a regular hexagon shape, and comprises a panel, a support grid and a heat preservation structure; the supporting grid is arranged on the inner side face of the panel and comprises dense rib beams which are arranged in a staggered mode. The supporting grid comprises six triangular grids which are arranged at intervals; the inner ends of the middle multi-ribbed beams intersect at one point, and the outer ends of the middle multi-ribbed beams are connected with the peripheral multi-ribbed beams; the heat preservation structure makes contact with the dam body and comprises a heat preservation plate and a heat preservation layer. The insulation board is filled in the support grid; the outer side face of the dense rib beam is coated with the heat preservation layer. According to the utility model, the traditional integrated insulation board is divided into a plurality of small blocks which are further positioned through the supporting grids, so that the connection strength between the insulation board and the panel can be enhanced, and the stripping risk between the insulation board and the panel is reduced; the hexagonal structural design is adopted, automatic alignment can be achieved under the action of gravity during splicing, the field splicing difficulty is reduced, and the construction efficiency is improved.
Owner:中铁十四局集团房桥有限公司 +1

Safety protection device for horizontal opening of building

The utility model discloses a safety protection device for a building horizontal hole. The safety protection device comprises a fixed end keel, an adjusting end keel, a telescopic keel arranged between the fixed end keel and the adjusting end keel and a cover plate assembly. The adjusting end keel moves to drive the telescopic keel to perform length adjustment, and the telescopic keel length adjustment drives the cover plate assembly to perform length adjustment synchronously; according to the safety protection device for the building horizontal hole in the technical scheme, the keels serve as framework supports of the cover plates, the adjusting end keels are matched with the telescopic keels to adjust the length of the whole device, meanwhile, the length of the cover plate installed at the upper end is synchronously adjusted, and the whole device can adapt to holes of different lengths; the supporting telescopic rod between the fixed end keel and the adjusting end keel ensures that the cover plate cannot fall down even if the cover plate is subjected to external impact, after the device is fixedly installed, sealing treatment is conducted through the waterproof sealing rubber strip, the waterproof performance of the hole position is ensured, the device can be repeatedly used, the construction cost is reduced, and building materials are saved.
Owner:CHINA METALLURGICAL CONSTR (TIANJIN) CONSTR ENG CO LTD

Reinforcing steel bar integral manufacturing jig frame for polygonal variable cross-section inclined tower column component

The invention provides a reinforcing steel bar integral manufacturing jig frame for a polygonal variable-cross-section inclined tower column component, which comprises a middle support working platform, an inner cavity support working platform, a plurality of movable support working platforms, a butt strap and a positioning system, and is characterized in that the middle support working platform is arranged in the center of opposite inclined surfaces of two column bodies of an inclined tower column; the middle support working platform is arranged along the outer contour of the center of the inclined surface of the inclined tower column, the movable support working platforms are arranged along the outer contour of the inclined tower column from the two sides of the middle support working platform, and the adjacent movable support working platforms and the joint of the middle support working platform are connected through butt straps; the inner cavity support operation platform is arranged along the inner cavity outline of the inclined tower column, the inner cavity support operation platform and the middle support operation platform are connected with stiff frameworks through adjustable supporting rods, vertical main reinforcements of the inclined tower column are fixedly connected with the stiff frameworks, and the positioning system is used for installing the vertical main reinforcements. And the two column bodies of the inclined tower column can be conveniently constructed at the same time, and the working efficiency is improved.
Owner:HUNAN ROAD & BRIDGE CONSTR GROUP

Overground and underground multi-storey building warehouse for grain storage

PendingCN118997566ATake full advantage of the advantagessave spaceWallsProtective foundationArchitectural engineeringGrain storage
The invention provides an overground and underground multi-storey building warehouse for grain storage. The overground and underground multi-storey building warehouse comprises an underground warehouse part and an overground warehouse part. The underground part utilizes a cavity of a double-layer barn wall structure to serve as a grain conveying channel, a ventilation system, a maintenance system and a waterproof system. The periphery and the bottom of the underground bin are each provided with an inner-layer bin wall and an outer-layer bin wall, the outer-layer bin wall and the inner-layer bin wall are connected into a whole through stiffening ribs, and the area defined by the inner-layer bin wall forms a grain storage area. A cavity formed between the inner bin wall and the outer bin wall can be provided with underground bin grain discharging equipment, a ventilation system, a drainage system and a maintenance channel. Horizontal conveying equipment is arranged in a bottom cavity of the underground bin, and vertical conveying equipment is arranged in a side wall cavity. And an overground overhead equipment layer is arranged at the terrace joint of the overground bin and the underground bin, is used as an overground and underground shared equipment layer and is used for grain discharging of the overground bin and grain feeding of the underground bin. The overground and underground multi-storey building bin for grain storage has the advantages that grain discharging is facilitated, heat preservation and heat insulation are achieved, and grain discharging equipment, ventilation equipment and the waterproof condition can be overhauled during grain storage.
Owner:HENAN UNIVERSITY OF TECHNOLOGY +1

Prefabricated steel structure buildings

ActiveCN224621181UImprove the efficiency of reinforcement and support workExtended service life
This utility model discloses a prefabricated steel structure building, belonging to the field of steel structure building technology. It addresses the problems of low efficiency and high cost in supporting and reinforcing steel structure joints. The device includes a main beam and a crossbeam. The crossbeam is fixed to one side wall of the main beam. An installation base is fixed to the bottom side wall of the main beam, and a connecting plate is fixed to the top side wall of the main beam. The connecting plate is bolted to the main beam. This utility model, through the setting of the reinforcement components, can complete the installation of the reinforcement components in a short time, thereby improving the efficiency of reinforcing and supporting the crossbeams and main beams. It also provides better support and reinforcement for the reinforcing bars. Compared with traditional welded reinforcement components, this device significantly improves installation efficiency, effectively reduces the difficulty of installation work for workers, is simple to operate, highly practical, and provides good reinforcement for the main beams and crossbeams. Furthermore, it extends the service life of the crossbeams and main beams after reinforcement and support.
Owner:HUBEI OULIDA DECORATION DESIGN ENG CO LTD

Assembly connection structure of steel column and wood beam

The utility model relates to the technical field of assembly connecting structures, and discloses a steel column and wood beam assembly connecting structure which comprises a steel column and a wood beam, a supporting plate is arranged at one end of the steel column, a steel column connecting component is arranged on the supporting plate in a penetrating mode, and a wood beam connecting component is arranged at the end, away from the steel column, of the steel column connecting component. The steel column connecting part and the wood beam connecting part are of an integrally-formed structure, and the wood beam connecting part is of a cross-shaped structure. A through mounting clamping groove is formed in the wood beam, and the outer diameter of the side edge of the wood beam connecting component is matched with the inner diameter of the mounting clamping groove; l-shaped side edge plates are arranged on the side faces of the wood beams, and third screw holes are formed in the side faces of the L-shaped side edge plates. According to the steel-wood combined joint, safe and reliable connection of beam-column joints is achieved, steel and wood components can be better fused in a building structure, and the steel-wood combined structural form can more widely meet the requirements of various building structures.
Owner:ZHEJIANG GAD

Recycled concrete composite floor slab and forming method

The invention discloses a recycled concrete composite floor slab and a forming method, and relates to the field of comprehensive utilization of solid waste, the recycled concrete composite floor slab comprises a prefabricated recycled concrete bottom plate, a bottom plate reinforcing mesh, cross truss reinforcing steel bars, a wood-wool cement board, a cast-in-place layer reinforcing mesh, a recycled concrete cast-in-place layer, a tie device and a seam splicing device; the recycled concrete is prepared by replacing part of cement with an environment-friendly material'recycled cement neat paste powder 'made of construction waste solids on a construction site, the wood-wool cement board is arranged between the prefabricated recycled concrete bottom board and the recycled concrete cast-in-place layer, and the recycled concrete bottom board and the recycled concrete cast-in-place layer are connected through the tying device and the seam splicing device. A good bonding effect is achieved between the composite floor slabs and between the prefabricated recycled concrete bottom plate, the recycled concrete cast-in-place layer and the wood-wool cement plate, the wood-wool cement plate is convenient for laying water and electricity pipelines, the anti-seismic property and durability of the plate can be improved, the structure is lightened, and an environment-friendly green building is constructed.
Owner:NANJING TECH UNIV +1

Photovoltaic composite roof based on prefabricated pottery sand concrete trough plate and construction method

The invention discloses a photovoltaic composite roof based on a prefabricated pottery sand concrete trough type plate and a construction method. In the roof, a concrete roof truss is provided with at least one concrete roof truss embedded steel plate; the groove-shaped plate is provided with at least one groove-shaped plate embedded part, and the groove-shaped plate embedded part is connected with the concrete roof truss embedded steel plate; gaps between the adjacent groove-shaped plates are filled with the waterproof mortar; the waterproof coiled material is laid on the multiple groove-shaped plates, and the waterproof coiled material is coated with a polyurethane waterproof coating layer; the Z-shaped purline is installed on the groove-shaped plate and located on the polyurethane waterproof coating layer. The roof sliding bracket is mounted on the Z-shaped purline; the photovoltaic roof panel is arranged on the roof sliding bracket; the polyurethane plate is laid on the polyurethane waterproof coating layer and located below the photovoltaic roof plate. The self weight of the photovoltaic composite roof is light, the indoor clearance height is increased, on-site wet operation is reduced through the prefabrication and hoisting construction technology, and the overall construction speed and construction quality of the roof and the utilization efficiency of photovoltaic modules are improved.
Owner:CCFED THE FIRST CONSTR & ENG +1

Adjusting tank utilizing construction adit as capacity expansion of underground cave depot

The utility model discloses a regulating reservoir using a construction adit as an underground cave depot capacity expansion. The regulating reservoir comprises a regulating reservoir body, the construction adit, a water delivery tunnel, a surge shaft, a flow control facility and a plugging body. The regulating reservoir is positioned at the downstream of the flow control facility and plays a role in regulating a downstream water delivery pipeline communicated to a water plant; one end of the construction adit is connected with the regulating reservoir, and the other end of the construction adit is connected with a tunnel section of the water delivery tunnel at the upstream of the surge shaft; the water conveying tunnel is a main flow passing channel, and the surge shaft is located on the upstream of the tail end of the water conveying tunnel and arranged close to a flow control facility as much as possible. The flow control facility is located at an outlet of the water delivery tunnel, the upstream is connected with the water delivery tunnel through a branch pipe, the downstream is connected with the regulating reservoir, the flow control facility comprises a flow regulating valve and a power station, and the flow regulating valve and the power station are arranged in parallel; the plugging body is arranged at the intersection of the construction adit and the water delivery tunnel and used for sealing the inner end of the construction adit. The utility model has the advantages that the construction land is saved, and the building materials are saved.
Owner:ZHEJIANG DESIGN INST OF WATER CONSERVANCY & HYDROELECTRIC POWER

Special brick for building concealed wiring decoration ditch frame

The invention discloses a special brick for a house-building concealed-wire-reserving decoration ditch frame. The special brick is used for house concealed-wire decoration without wall striking; and B, huge waste is avoided. The method comprises the following steps: (1) furrows and frames are reserved at required positions; the building method is simple and fast; the original design of the house is not influenced; the production raw materials of the special brick are the same as those of common sintered bricks. The depths of the transverse ditches and the vertical ditches are 30 millimeters, and the widths of the ditches can be 60 millimeters, 120 millimeters and 180 millimeters as required. The transverse ditches are generally arranged on the roof and turn to the opposite wall top along the wall top. A vertical ditch with the width of 60 mm is built by the ditch bricks, two threading pipes are arranged in parallel, and two wire boxes are arranged at the lower end. Vertical ditches with the width of 120 mm are built in a matched mode through the ditch bricks and the frame bricks, and vertical ditches with the width of 60 mm are built alternately through one layer of ditch bricks and one layer of frame bricks; and the ditch bricks are alternately built on the left and the right for seam pressing. And a wire box frame is independently built by the frame bricks. (2) a frame (mounting a wire box or a switch box) is built at the lower end of the vertical ditch and is 1m away from the floor tile;
Owner:廖述依

Buried box-pump integrated water tank and preparation process thereof

The invention relates to the field of water resource management facilities, and discloses a buried box-pump integrated water tank and a preparation process thereof.The buried box-pump integrated water tank comprises a tank body and a pump room, the tank body is round, buried underground and used for bearing life and fire fighting water, and the tank body is made of corrugated galvanized sheets. The underground occupied area is reduced, direct burial is achieved, a cement base is not needed, external stress is reduced and dispersed, and later maintenance is facilitated. Due to the adoption of the circular design, the structural strength of the water tank is enhanced, and the excavation amount of underground engineering is reduced. Compared with the traditional square or rectangular water tank, the circular structure is closer to the ideal state of uniform pressure distribution, so that the space is more effectively utilized, the earth excavation volume is reduced, and the design enables the water tank to provide larger capacity in the limited space and is an ideal choice for water resource management in cities and suburbs.
Owner:XIAN LEIYU WATER SUPPLY EQUIPMENT CO LTD

Fabricated building wall positioning and mounting structure

The utility model provides an assembly type building wall positioning and mounting structure, which relates to the technical field of assembly type building construction and comprises a stand column, an assembly wall a is arranged on one side of the stand column, an assembly wall b is arranged on one side of the assembly wall a, and two splicing groove positioning components are respectively arranged on two opposite sides outside the assembly wall a and the assembly wall b. Grooves are formed in the two sides of the exterior of the assembly wall a and the two sides of the exterior of the assembly wall b. According to the positioning and mounting structure, the assembly wall a and the assembly wall b can be positioned through the positioning assembly, a supporting rod does not need to be used for limiting, building materials are greatly saved, the space occupancy rate is low, mounting by constructors cannot be affected, and the positioning and mounting structure can be repeatedly used; various auxiliary devices are not needed in the installation process, the operation process is simple and convenient, time and labor are saved, and practicability is improved.
Owner:GUANGZHOU ZHENZHONG CONSTRUCT CO LTD

Fabricated crossed hollow beam building floor structure

The utility model discloses an assembly type crossed hollow beam building floor structure, and belongs to the technical field of building structure engineering. The structure comprises a plurality of columns and crossed hollow grid beams, every two adjacent columns in the columns are connected through a precast beam, all the columns and all the precast beams jointly define a rectangular frame, the crossed hollow grid beams are located in the rectangular frame and connected with the columns and the precast beams, and the hollow grid beams are arranged in grids of the crossed hollow grid beams. Prefabricated unit plates are arranged in grids defined by the crossed hollow grid beams, the columns and the prefabricated beams, and cast-in-place floor slabs are arranged on the columns, the prefabricated beams, the crossed hollow grid beams and the prefabricated unit plates jointly. The method can be suitable for large-span public buildings or industrial plants; in the construction process of columns, prefabricated beams, crossed hollow grid beams and prefabricated unit plates, temporary supports such as steel corner connectors do not need to be additionally arranged and dismantled, steel bars do not need to be additionally arranged either, and the construction efficiency is remarkably improved.
Owner:GUIZHOU UNIV +1

Multi-party intelligent supervision system for muck

The invention discloses a multi-party intelligent monitoring system for residual mud and muck, which comprises a data acquisition module, a data processing module and a multi-party monitoring platform, and is characterized in that the data processing module is used for acquiring the mud output, the number of transportation times, the transportation path, the scattering and leaking condition and the soil scheduling amount according to the acquired data; and sending the mud discharge amount, the number of times of transportation, the transportation path, the scattering and leaking conditions and the soil amount scheduling amount to a multi-party supervision platform. The method can significantly improve the supervision efficiency, improves the environmental benefits, promotes the cyclic utilization of resources, and increases the public participation degree.
Owner:GUANGZHOU SMART CITY INVESTMENT & OPERATION CO LTD

A multifunctional support erection method for construction of a mid-span steel tube concrete arch bridge

The invention discloses a multifunctional support erection method for the construction of a mid-span steel tube concrete arch bridge, which is carried out according to the following steps: (1) erecting a lower arch rib assembly support, which also serves as a beam storage and installation platform; (2) welding and extending the beam segments into a whole on the beam splicing support platform; hoisting the spliced ​​beam to the beam storage and installation platform for storage; (3) continuing to erect the upper arch rib assembly support to the designed position, and after the support is erected, the arch rib is erected, and the arch rib concrete is poured; (4) after the concrete age and strength meet the requirements, the upper arch rib assembly support is removed; (5) continuing to install the suspension rod, and using the crawler crane to install the beam placed in advance at the corresponding position on the beam storage and installation platform; (6) after all the construction is completed, the remaining supports are removed. The invention has the advantages of safe and reliable support force, can improve the construction accuracy and quality of arch rib erection and beam installation, save costs, shorten the construction period, etc.
Owner:1ST ENG OF CHINA ZHONGTIE MAJORBRIDGE GROUP

Construction support system and its erection method

The present invention discloses a construction support system and a method for erecting the same, which are used for constructing a steep cliff, wherein the slope of the steep cliff is greater than or equal to 79 degrees and less than or equal to 90 degrees, and the construction support system comprises: a foundation platform, a first-level support, a cantilever platform, a second-level support, and a slope anchor rod, wherein the foundation platform is arranged at the foot of the slope of the steep cliff, the foundation platform comprises a plurality of steps, the plurality of steps are fixedly connected in sequence along a first direction and the height increases progressively; the first-level support is erected on the plurality of steps of the foundation platform; the cantilever platform is anchored on the steep cliff rock wall and is located above the first-level support; the second-level support is partially arranged on the cantilever platform; and the slope anchor rod is anchored on the steep cliff rock wall and is located above the cantilever platform, wherein another part of the second-level support is arranged on the slope anchor rod. The present invention can be erected on a steep cliff rock wall with a height exceeding 100 meters, has a stable structure, and provides a safe working environment for construction personnel.
Owner:中铁二十局集团第三工程有限公司 +1

Quadrilateral fitting non-positive spherical surface energy-saving aluminum plate curtain wall based on BIM technology

The utility model discloses a quadrilateral fitting non-positive spherical surface energy-saving aluminum plate curtain wall based on the BIM technology. The quadrilateral fitting non-positive spherical surface energy-saving aluminum plate curtain wall comprises a building body, a plurality of aluminum plates and curtain wall keels. The cross sections of the aluminum plates are parallelograms, and the adjacent aluminum plates are arranged in an up-and-down flush mode. The aluminum plates are installed on the curtain wall keels, and the curtain wall keels are arranged along the joints of the vertically adjacent aluminum plates in a full-length mode. A supporting assembly is arranged on the inner side of the curtain wall keel, and the curtain wall keel is connected with the building body through the supporting assembly. The supporting assembly comprises a first supporting rod, a second supporting rod, a first switching assembly and a second switching assembly; according to the scheme, the BIM technology is applied in the whole life cycle, the machining precision is improved, and the site construction error is reduced, so that energy is effectively saved, site construction pollution is reduced, the construction efficiency is improved by 33%, and the whole project is more efficient, convenient, environmentally friendly and capable of saving energy in the manpower and construction period.
Owner:SUZHOU GOLD MANTIS CURTAIN WALL CO LTD

A rapidly deployable inflatable evacuation platform system

A kind of inflatable evacuation platform system of quick deployment, including one or more mutual series evacuation platform, the evacuation platform includes main frame, inflatable support air bag, drive cylinder and inflation device;Slide rail is arranged between the main frame and the ground of tunnel, the inflatable support air bag is arranged on the main frame, the inflatable support air bag includes several section air bags, each section air bag is connected by air passage, one end of the inflatable support air bag is fixedly connected with the side of the main frame, support partition is arranged between each section air bag;The drive cylinder is fixedly connected with the main frame, the drive rod of the drive cylinder is fixedly connected with the side wall of tunnel;The inflatable support air bag is connected with the inflation device.
Owner:BEIJING DINGCHANG COMPOSITE MATERIALS CO LTD

Composite curing agent and preparation method of cured soil thereof

The invention relates to the technical field of curing agent and solidified soil preparation, in particular to a composite curing agent and a solidified soil preparation method thereof.The solidified soil is prepared from Portland cement, calcium oxide, fly ash, gypsum, chopped fibers, zeolite, a microbial agent, ethylenediamine tetraacetic acid and alkyl sulfonate; the function of decomposing harmful substances in the polluted soil can be achieved while the strength of the solidified soil is met, and direct utilization of the polluted soil is achieved.
Owner:LIANYUNGANG HARBOR ENG CO +2

Prefabricated door platform

The utility model belongs to prefabricated building technical field provides an assembly type prefabricated door platform, the assembly type prefabricated door platform includes prefabricated platform, a plurality of prefabricated support beam, a plurality of prefabricated step support and a plurality of prefabricated steps, and the prefabricated platform is flat plate, a plurality of prefabricated support beam interval is established in the lower side of prefabricated platform, and the bottom surface of prefabricated support beam is in contact with ground, and the top is connected with prefabricated platform, and is used to prop up prefabricated platform, a plurality of prefabricated step supports are intervally arranged on the lower side of the prefabricated platform, the prefabricated step support is arranged with a plurality of support surfaces in the form of prefabricated steps, and the top of the prefabricated step support is connected with the prefabricated platform, and a plurality of prefabricated steps are respectively arranged on the support surface or the ground and connected with the prefabricated step support. The assembly type prefabricated door platform provided by the utility model has higher construction efficiency compared with the present factory masonry or pouring when building on site, and a large number of hollow structures are formed inside, so that the required building materials are less, and the construction cost can be effectively reduced.
Owner:HEBEI JINGTONGBUIIDING TECH CO LTD

A construction method for a special-shaped prefabricated pile zipper support structure

This invention discloses a zipper-type support structure for irregularly shaped precast piles and its construction method. The irregularly shaped precast piles include irregularly shaped pile end plates and irregularly shaped pile bodies. The pile body is made of concrete and prestressed, with a reinforcing cage inside, and the pile web is a hollow circle. The irregularly shaped precast piles are irregularly short T-shaped. The construction method involves symmetrically constructing the irregularly shaped precast piles on-site in a staggered manner. Two staggered irregularly shaped precast piles are tightly interlocked to form a chain-type support structure. After the interlocking construction of the irregularly shaped precast piles is completed, a small-diameter high-pressure jet grouting mixing pile is constructed at the joint of the two parallel irregularly shaped precast piles to form a high-pressure jet grouting waterstop to seal the gap formed by the parallel irregularly shaped precast piles. A concrete cap beam is installed on top of the irregularly shaped precast piles. This invention is particularly suitable for construction environments with limited space, saves on concrete and cement usage for the waterstop mixing piles, and enhances the integrity and resistance to lateral deformation of the foundation pit support structure, resulting in significant economic and environmental benefits.
Owner:NANJING RES INST OF SURV MAP & GEOTECH INVESTIG CO LTD

A novel type of confined brine recycled concrete pile and its construction method

PendingCN122562476Aemission reductionsave building materials
This invention discloses a novel type of confined brine recycled concrete pile and its construction method, belonging to the field of transportation engineering. The materials used to prepare the novel pile include a confining pipe, brine, recycled aggregate, curing agent, and admixtures. The confining pipe is a corrosion-resistant pipe with good mechanical properties. The brine is high-salinity brine from salt lakes or seawater left over from salt production. The recycled aggregate is derived from continuously graded aggregate obtained by crushing and screening construction waste. The curing agent consists of a cementing component and an expansion component. The expansion component is a material that reacts with chloride and sulfate ions in the brine to form expanding hydrates. The expansion component includes, but is not limited to, a mixture composed of aluminate cement, quicklime, and gypsum in a mass ratio ranging from 9~12:0-23:0~30. The cementing component consists of slag and an alkali activator. The brine, recycled aggregate, curing agent, and admixtures are mixed evenly in proportion and filled into the confining pipe, which has been pre-embedded in the foundation, and then vibrated to compact the mixture, forming a novel type of confined brine recycled concrete pile with high strength and good durability.
Owner:NORTHWESTERN POLYTECHNICAL UNIV

A tunnel construction parameter optimization method, device, equipment and readable storage medium

The present invention provides a method, device, equipment and readable storage medium for optimizing tunnel construction parameters, which relates to the technical field of highway tunnels, including obtaining first data, wherein the first data includes the volume of the plastic yield zone of the tunnel surrounding rock obtained by sampling the tunnel scene based on the mutation theory method; constructing a constrained multi-objective planning function according to the first data; calculating and obtaining an MSVR model corresponding to the constrained multi-objective planning function according to the constrained multi-objective planning function; performing parameter optimization processing on the MSVR model through a particle swarm optimization algorithm to obtain an optimal MSVR model; generating tunnel construction parameters through the particle swarm optimization algorithm, using the optimal MSVR model for calculation, and finally outputting the optimal tunnel construction parameters. Beneficial effects: The present invention can obtain an intelligent system for optimal tunnel construction parameters, so that the construction can accelerate the construction progress and reduce the building materials required for construction to the greatest extent while ensuring the stability of the surrounding rock.
Owner:中铁建云南投资有限公司 +1