Rapid rebar rust removing equipment for construction
A technology for construction and reinforcement, applied in metal processing equipment, grinding/polishing equipment, grinders, etc., can solve the problems of time-consuming, labor-intensive, easily injured, and low work efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0027] A kind of rapid derusting equipment for steel bars for construction, such as Figure 1-3As shown, it includes a bottom plate 1, a first slider 3, a first vertical plate 4, a fixed plate 5, a first electric reel 6, a first pull wire 7, a first spring 8, a connecting rod 9, a wire brush 10, Rotating device 11 and up and down moving device 12, base plate 1 top left side is provided with rotating device 11, base plate 1 top right side has chute 2, is provided with the first slide block 3 that cooperates with it in chute 2, chute 2 and The first slider 3 is slidingly fitted, and the top of the first slider 3 is connected with a first vertical plate 4 by means of bolt connection. The left side of the first vertical plate 4 is provided with an up and down moving device 12, and the left end surface of the moving part of the up and down moving device 12 is Connecting rod 9 is installed, and the left end of connecting rod 9 is equipped with wire brush 10 by bolt connection, and t...
Embodiment 2
[0029] A kind of rapid derusting equipment for steel bars for construction, such as Figure 1-3 As shown, it includes a bottom plate 1, a first slider 3, a first vertical plate 4, a fixed plate 5, a first electric reel 6, a first pull wire 7, a first spring 8, a connecting rod 9, a wire brush 10, Rotating device 11 and up and down moving device 12, base plate 1 top left side is provided with rotating device 11, base plate 1 top right side has chute 2, is provided with the first slide block 3 that cooperates with it in chute 2, chute 2 and The first slider 3 is slidingly fitted, and the top of the first slider 3 is connected with a first vertical plate 4 by means of bolt connection. The left side of the first vertical plate 4 is provided with an up and down moving device 12, and the left end surface of the moving part of the up and down moving device 12 is Connecting rod 9 is installed, and the left end of connecting rod 9 is equipped with wire brush 10 by bolt connection, and ...
Embodiment 3
[0032] A kind of rapid derusting equipment for steel bars for construction, such as Figure 1-3 As shown, it includes a bottom plate 1, a first slider 3, a first vertical plate 4, a fixed plate 5, a first electric reel 6, a first pull wire 7, a first spring 8, a connecting rod 9, a wire brush 10, Rotating device 11 and up and down moving device 12, base plate 1 top left side is provided with rotating device 11, base plate 1 top right side has chute 2, is provided with the first slide block 3 that cooperates with it in chute 2, chute 2 and The first slider 3 is slidingly fitted, and the top of the first slider 3 is connected with a first vertical plate 4 by means of bolt connection. The left side of the first vertical plate 4 is provided with an up and down moving device 12, and the left end surface of the moving part of the up and down moving device 12 is Connecting rod 9 is installed, and the left end of connecting rod 9 is equipped with wire brush 10 by bolt connection, and ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com