Unlock instant, AI-driven research and patent intelligence for your innovation.

An installation method of a beam-column universal joint structure on the roof of a steel structure building

A technology of node structure and installation method, which is applied in building structure, processing of building materials, construction, etc., can solve problems such as lack of installation method of universal joint structure, potential safety hazard of welding method, increased workload, etc., and achieve reduction of hanging The difficulty of convenient installation of the frame, the effect of improving the safety and firmness index, and improving the construction efficiency

Inactive Publication Date: 2018-03-23
滁州筑梦绿色建筑有限公司
View PDF7 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] With the development of social economy, the expansion of human cultural activities, the expansion of production scale and the expansion of storage needs, steel structure buildings are more and more widely used. The construction of traditional steel structure buildings is mostly carried out by welding on site. The connection increases the workload and is limited by the construction environment and conditions, and the welding method has potential safety hazards
[0003] The universal joint structure can be freely rotated in any direction; it meets the needs of constructing a three-dimensional structure. At present, the universal joint is mainly used for power transmission, and there is no relevant patent for the installation method of the universal joint structure in the steel structure building. report

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • An installation method of a beam-column universal joint structure on the roof of a steel structure building
  • An installation method of a beam-column universal joint structure on the roof of a steel structure building
  • An installation method of a beam-column universal joint structure on the roof of a steel structure building

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0021] The following will clearly and completely describe the technical solutions in the embodiments of the present invention in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some of the embodiments of the present invention, not all of them. Based on The embodiments of the present invention and all other embodiments obtained by persons of ordinary skill in the art without making creative efforts all belong to the scope of protection of the invention.

[0022] see Figure 1-3 , the present invention provides a technical solution:

[0023] Such as Figure 1-3 As shown, the installation method of a beam-column universal joint structure on the roof of a steel structure house in this embodiment includes a high-strength bolt ball joint screw head (1), a similar bolt ball joint adjustment cylinder (2), a high-strength bolt screw rod (3) , union nut (4), set nut (5), set screw (6), self-lubricati...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an installation method of a steel structure building main pillar cardan joint structure. The installation method comprises the steps of connection of cardan joints and bolts, connection of bolts and main pillars, and screwing and adjusting of the bolts. According to the installation method of the steel structure building main pillar cardan joint structure, the construction is simple, connection of steel structure beam columns at random angles can be achieved, the process is not limited by sites, the welding steps are abandoned, the quality of a steel structure joint is improved, and the potential safety hazard of a steel structure building is gotten ridden of.

Description

technical field [0001] The invention specifically relates to a method for installing a universal joint structure, and belongs to the field of building material installation. Background technique [0002] With the development of social economy, the expansion of human cultural activities, the expansion of production scale and the expansion of storage needs, steel structure buildings are more and more widely used. The construction of traditional steel structure buildings is mostly carried out by welding on site. The connection increases the workload and is limited by the construction environment and conditions, and the welding method has potential safety hazards. [0003] The universal joint structure can be freely rotated in any direction; it meets the needs of constructing a three-dimensional structure. At present, the universal joint is mainly used for power transmission, and there is no relevant patent for the installation method of the universal joint structure in the stee...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E04B1/58E04B1/36E04G21/14
CPCE04B1/2403E04B1/36E04B2001/2406E04B2001/2418E04B2001/2439E04G21/14
Inventor 张俊娥钱冬梅
Owner 滁州筑梦绿色建筑有限公司