caisson construction method
A caisson and construction method technology, which is applied in the direction of construction, caisson, and infrastructure engineering, can solve the problems of large construction surface, shaft deviation, and heavy workload, so as to improve construction efficiency, ensure construction safety, and ensure construction quality. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0040] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the drawings in the embodiments of the present invention.
[0041] The invention provides a caisson construction method, the working principle of which is to use this method to reduce the working surface on the ground and reduce the influence of the weather on the construction, and to use the inner formwork of the well wall and the outer formwork of the well wall to sink into the ground together with the concrete well wall to avoid The removal of formwork is eliminated to ensure the quality of the wellbore, and the method of taking soil and pouring the wellbore simultaneously improves the construction efficiency; using steel pipe piles as guides ensures the construction quality, thus solving the problem of repeated disassembly and assembly of scaffolding in the prior art And the problems of heavy workload, large construction area, high ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com