A kind of parallel slope surface buffer hole deep hole slope pre-split blasting construction method

A technology of pre-splitting blasting and construction method, which is applied in blasting and other directions, and can solve problems such as landslides or landslides in small areas, affecting construction quality, safety, progress and driving safety, and large blasting crushing circles, so as to reduce secondary disasters caused by blasting and promote Self-stabilizing function, the effect of blocking blasting disturbance

Active Publication Date: 2019-07-12
CCCC FIRST HIGHWAY XIAMEN ENG +1
View PDF1 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Because the diameter of the down-the-hole drill used in deep hole blasting is relatively large, basically more than Φ90mm, and the diameter of the cartridge used is more than Φ70mm, resulting in excessively large blasting crushing circles, rupture circles and loosening circles, and secondary hazards such as blasting cracks expanding in a large range , The blasting disturbance is large, and the pre-splitting blasting charge is not specially processed for the slope hole, resulting in serious over-excavation of the slope, loss of blocks, and uneven rocks on the slope surface. Small-scale landslides and even landslide accidents occur from time to time, and the risk elimination and heavy workload seriously affect the construction quality, safety, progress and later driving safety

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A kind of parallel slope surface buffer hole deep hole slope pre-split blasting construction method
  • A kind of parallel slope surface buffer hole deep hole slope pre-split blasting construction method
  • A kind of parallel slope surface buffer hole deep hole slope pre-split blasting construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0031] see Figure 1-2 , a pre-splitting blasting construction method for deep hole slopes with buffer holes on parallel slopes. The specific construction process is: construction preparation→removal of overburden and scum→measurement and lofting→layout holes→production of slope ruler→installation of slope calibration frame→drilling → Preparation of pre-split blasting charge package → Charge charge → Blocking → Blasting network connection → Blasting warning → Ignition and detonation → Post-blasting inspection → Lifting the warning → Excavation and transportation of blasting slag.

[0032] Specific steps are as follows:

[0033] 1) Construction preparation: The operators and machines are in place on time and meet the start-up conditions.

[0034] 2) Removal of overburden and scum: According to the design requirements of flat field construction, remove existing pine rocks or topsoil layers on the site, expose the rocks, and meet the conditions for drilling and blasting. In the...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a parallel slope face buffering-hole deep-hole side slope presplitting blasting construction method. The presplitting blasting construction method comprises the following steps of construction preparation, removal of surface soil and scum, staking out in survey, arrangement of holes, fabrication of a slope rule, installation of a slope face calibrating rack, drilling of holes, fabrication of presplitting blasting gunpowder packets, charging of gunpowder, blocking, connection of a blasting network, blasting warning, igniting and blasting, checking after blasting and removal of the warning and digging and shipping of the blasting scum. According to the parallel slope face buffering-hole deep-hole side slope presplitting blasting construction method, the gunpowder charging structure is changed, and the side slope presplitting blasting one-off molding technology is adopted, so that reduction of blasting secondary disasters in a main blasting area is facilitated. A presplitting hole is in transition and connection with main blasting holes through a buffering-hole which is parallel to the presplitting hole; and within a certain relative position range, the presplitting hole is firstly blasted, then the main blasting holes are blasted, and finally the buffering-hole is blasted. After the side slope presplitting hole is blasted, a presplitting crack along the slope face is formed, the further extension of blasting cracks transmitted by the main blasting area towards an outline face can be effectively obstructed, and the blasting disturbance is obstructed.

Description

technical field [0001] The invention belongs to the technical field of building construction engineering, and in particular relates to a pre-splitting blasting construction method for deep hole slopes with buffer holes on parallel slopes. Background technique [0002] At present, in the process of excavating highway subgrades by drilling and blasting method in my country, there is a common phenomenon that the blasting construction of high side slopes of subgrades is rough. The slope shall be repaired by means of small-aperture shallow-hole blasting. Because the diameter of the down-the-hole drill used in deep hole blasting is relatively large, basically more than Φ90mm, and the diameter of the cartridge used is more than Φ70mm, resulting in excessively large blasting crushing circles, rupture circles and loosening circles, and secondary hazards such as blasting cracks expanding in a large range , The blasting disturbance is large, and the pre-splitting blasting charge is not...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): F42D1/00F42D3/04F42D5/00
CPCF42D1/00F42D3/04F42D5/00
Inventor 程玉泉谷世平王铁法牛海喜叶派平范代强李秋霜
Owner CCCC FIRST HIGHWAY XIAMEN ENG