Multi-node cluster cross-upgrade method
A multi-node, cluster technology, applied in the storage field, can solve problems such as business interruption and storage software system impact
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0051] In specific implementation, in the above-mentioned multi-node cluster cross-upgrade method provided by the embodiment of the present invention, when performing software upgrade, as follows figure 2 As shown, before performing step S101 to select a node or some nodes in the cluster, it may also include:
[0052] S201. Upload the upgrade installation package to any node through the management interface (Web) or the secure shell protocol (Secure Shell, referred to as SSH); the upgrade installation package is used for software upgrades;
[0053] S202. Any node distributes the upgrade installation package to other nodes.
[0054] Next, step S101 is performed to select a node or a part of nodes among the nodes having mutual backup according to the node number, etc., and start the upgrade program.
[0055]Further, during specific implementation, in the above-mentioned multi-node cluster cross-upgrade method provided by the embodiment of the present invention, as follows fi...
Embodiment 2
[0076] In specific implementation, in the above-mentioned multi-node cluster cross-upgrade method provided by the embodiment of the present invention, when performing hardware upgrade, as follows image 3 As shown, before selecting a node or some nodes in the cluster, you can also include:
[0077] S301. Click hardware upgrade through the management interface.
[0078] Further, during specific implementation, in the above-mentioned multi-node cluster cross-upgrade method provided by the embodiment of the present invention, as follows image 3 As shown, after step S102 is performed to upgrade the program to leave the cluster, it may also include:
[0079] S302, shutting down the selected node;
[0080] S303. After shutting down, replace and upgrade the hardware;
[0081] S304. After the upgrade is completed, the selected node is powered on.
[0082] Furthermore, during specific implementation, in the above-mentioned multi-node cluster cross-upgrade method provided by the em...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com