[0026] The invention will be described below in connection with an exemplary system.
[0027] In one embodiment of the invention, see figure 1 , the method includes the following steps:
[0028] S101. Obtain the number of sub-grids included in the power grid after a fault occurs, and obtain the power station nodes, substation nodes and lines connecting them contained in each sub-grid;
[0029] S102. If there are power station nodes and the sub-grid includes at least 2 nodes, set a power station node as a slack node;
[0030] S103. According to the power station nodes, substation nodes and lines in each sub-grid, run the AC optimal power flow model (ACOPF), if the calculation result of the AC optimal power flow model (ACOPF) does not converge, execute step S104;
[0031] S104, run the AC power flow model (ACPF), for the sub-grid Overload ratio Nodes with load demand around the highest line shed n% load, where n is the preset value,
[0032] S105, operating the AC optimal p...