A Day-Ahead Scheduling Method of Power Grid Based on Step Characteristics of Air Conditioning Load Participation
A technology of air-conditioning load and step characteristics, which is applied to the integration of power network operating systems, circuit devices, and climate sustainability. And other issues
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0020]The specific embodiments of the present invention will be further described below in conjunction with the above accompanying drawings. Such asfigure 1 As shown, based on the stepwise load, the central air conditioning system is reduced to the construction method of the virtual peak unit participating in the grid, and the air conditioner baseline load specific method is as follows:
[0021](1) In Spring every year, the daily load curve is P in April.Spring, D, B ;
[0022](2) Statistics Average load curve of working days in AprilAs spring load curve PSpring, H ;
[0023]Use the same method to get the average load curve of the autumn working day represented in October PAutumn, h Where W is working day, H is the number of hours per day. The average of the spring and autumn load curve as the "no air-conditioned electric load curve" without the air-conditioning load in the summer, as the baseline load curve, the average of the 2 quarters of spring and autumn can eliminate the effects of nat...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com