A railway pillow changing device and its working method
A railway and sleeper technology, which is applied in the field of railway sleeper changing devices, can solve the problems of low automation, low construction efficiency, and spike collision, and achieve the effects of reducing labor intensity, reducing operating time, and improving automation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0048] as attached figure 1 to attach Figure 5 , and attached Figure 12 As shown, a specific embodiment of a railway sleeper changing device is installed on an excavator 8 for replacement of sleepers 6, including:
[0049] mount 1;
[0050] Installed in front of the mounting base 1, the ballast plate 2 is used for ballast excavation and backfilling;
[0051] A horizontal rotation mechanism 3 installed under the mount 1;
[0052] The vertical turnover mechanism 4 installed under the horizontal rotation mechanism 3;
[0053] Installed on both axial ends of the vertical turning mechanism 4, the sleeper clamping mechanism 5 is used to realize the clamping and releasing of the sleeper 6.
[0054] Wherein, the ballast plate 2 is installed in front of the mounting base 1 by bolts. Pillow clamping mechanism 5 is installed on vertical turning mechanism 4 along turning axis direction (as attached) by bolts. Figure 4 The two ends shown in A) can make the sleeper turn over, avoi...
Embodiment 2
[0061] as attached Figure 6 to attach Figure 11 As shown, a specific embodiment of the operation method of the railway pillow changing device described in Embodiment 1, comprising the following steps:
[0062] S10) The ballast is excavated to a certain depth by using the ballast digging board 2, and the railway pillow changing device 10 is switched to the working mode of the pillow clamping mechanism through the four-bar linkage mechanism of the arm 9 of the excavator 9 (from the clamping pillow of the pillow clamping mechanism 5). The operation mode is switched to the ballast digging operation mode of the ballast digging plate 2), and new sleepers 6 are laid;
[0063] S11) The sleeper 6 is clamped by the clamping sleeper mechanism 5 and moved to the top of the rail 7. At this time, the sleeper 6 is perpendicular to the length direction of the rail 7, and the spikes 61 of the sleeper 6 are vertically upward. Figure 6 As shown; then the sleeper 6 is vertically turned 90 de...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com