Construction method of high slope over 100m with zero distance from national highway
A construction method and zero-distance technology, which is applied in earth-moving drilling, open-pit mining, construction, etc., to achieve the effect of ensuring smooth passage and ensuring safe and smooth passage.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0035] Specific embodiments of the present invention will be described in detail below.
[0036] as attached figure 1 As shown, a construction method for a high slope of more than 100m with zero distance from the national highway includes the following steps:
[0037] Step 1, stockyard mining plan formulation;
[0038] Step 1.1, stockyard mining division, the stockyard mining area is divided into the main mining area and the reserved rock mass belt mining area;
[0039] Step 1.2, calculation of blasting parameters, predetermined blasting slag avalanche direction and main blasting slag rolling direction, wherein the main blasting slag should be prevented from rolling onto the national road;
[0040] Step 2. Set up blasting slag rolling protection device;
[0041] Step 2.1, the mining face of the main mining area is provided with protective belts at intervals of 20m to block rolling stones, forming multi-level protection;
[0042] Step 2.2, setting up a penetrating protectiv...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com