Transmission resource scheduling method, network equipment and terminal equipment

A technology of transmission resources and scheduling methods, which is applied in the field of network equipment and terminal equipment, and transmission resource scheduling, which can solve the problems of waste of transmission resources and low transmission efficiency, and achieve the effect of improving utilization efficiency, improving utilization efficiency and performance

Active Publication Date: 2018-07-03
VIVO MOBILE COMM CO LTD
View PDF4 Cites 11 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The embodiment of the present invention provides a transmission resource scheduling method, network equipment, and terminal equipment to solve the problems of low transmi

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Transmission resource scheduling method, network equipment and terminal equipment
  • Transmission resource scheduling method, network equipment and terminal equipment
  • Transmission resource scheduling method, network equipment and terminal equipment

Examples

Experimental program
Comparison scheme
Effect test

no. 1 example

[0038] Such as figure 1 As shown, the embodiment of the present invention provides a method for scheduling transmission resources, which is applied to network equipment, and the method specifically includes:

[0039] Step 101: Configure a first type of transmission resource corresponding to a first type of service.

[0040] Among them, in the 5G mobile communication system, in order to adapt to more diverse scenarios and business needs, 3GPP defines three major directions for 5G application scenarios: mobile broadband enhanced eMBB, large-scale Internet of Things mMTC, and ultra-high reliability and ultra-low latency communication uRLLC. Wherein, the system configures corresponding dedicated transmission resources for different types of services, the first type of transmission resources are dedicated transmission resources for the first type of services, and the first type of services can be one of eMBB services, mMTC services and uRLLC services, That is, the system configur...

no. 2 example

[0047] The above first embodiment briefly introduces the transmission resource scheduling method of the present invention, and the following embodiment will further describe it in conjunction with the accompanying drawings and specific application scenarios.

[0048] Specifically, such as figure 2 As shown, the method for scheduling transmission resources in the embodiment of the present invention includes the following steps:

[0049] Step 201: Configure a first type of transmission resource corresponding to a first type of service.

[0050] The network device configures corresponding eMBB resources for the eMBB service, configures corresponding mMTC resources for the mMTC service, and configures uRLLC resources for the uRLLC service. In this embodiment, the first type of service is the uRLLC service, wherein the uRLLC service is bursty, and there may be a scene where the uRLLC service does not occur frequently.

[0051] Step 202: Reserve a first sub-transmission resource of...

no. 3 example

[0080] The above second embodiment briefly introduces one application scenario of the transmission resource scheduling method of the present invention, and the following embodiment will further describe another application scenario with reference to the accompanying drawings.

[0081] Specifically, such as Figure 5 As shown, the method for scheduling transmission resources in the embodiment of the present invention includes the following steps:

[0082] Step 501: Configure a first type of transmission resource corresponding to a first type of service.

[0083] The system configures corresponding eMBB resources for the eMBB service, configures corresponding mMTC resources for the mMTC service, and configures corresponding uRLLC resources for the uRLLC service. In this embodiment, the first type of service is eMBB service or mMTC service, and the first type of transmission resource is eMBB or mMTC resource. Since the priority of uRLLC service in this scenario is lower than tha...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a transmission resource scheduling method, network equipment and terminal equipment. The method comprises steps: first-type transmission resources corresponding to first-type business are configured; at the arrival of the first-type business, according to a first transmission policy, the business data of the first-type business are transmitted through first sub transmissionresources in the first-type transmission resources; and at the arrival of the second-type business, according to a second transmission policy, the business data of the second-type business are transmitted through second sub transmission resources in the first-type transmission resources. The network equipment schedules corresponding special transmission resources for different types of business to enable multiplex transmission to be carried out among different types of business, the utilization efficiency of the special transmission resources is thus improved, and the system resource utilization efficiency and the performance are better improved.

Description

technical field [0001] The present invention relates to the field of communication technology, in particular to a method for scheduling transmission resources, network equipment and terminal equipment. Background technique [0002] Compared with previous mobile communication systems, future 5G mobile communication systems need to adapt to more diverse scenarios and business requirements. The main scenarios of 5G include mobile broadband enhanced eMBB, large-scale Internet of Things mMTC, and ultra-reliable and ultra-low-latency communication uRLLC. These scenarios put forward requirements for the system such as high reliability, low latency, large bandwidth, and wide coverage. In order to meet different needs of services and different application scenarios, the 5G system can support the transmission of multiple services. For example, one carrier bandwidth can be configured with parallel transmission of eMBB, uRLLC, and mMTC. Different frequency band resources can be configur...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): H04W72/04H04W72/12
CPCH04W72/044H04W72/53H04W72/20
Inventor 鲁智沈晓冬丁昱
Owner VIVO MOBILE COMM CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products