Transition line section tunnel CRD (Cross Diaphragm) construction method

A technology of CRD method and construction method, which is applied in tunnels, tunnel linings, earthwork drilling and mining, etc., and can solve problems such as tunnel top subsidence, construction safety accidents, and excessive cross-sectional spans

Inactive Publication Date: 2018-07-24
BEIJING MUNICIPAL CONSTR
View PDF5 Cites 16 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

When the span of the section is too large, because the CD method and the CRD method are used for construction, the span is divided into two excavations, and there is a problem that the section span of each excavation is too large. During the excavation construction process , prone to tunnel roof collapse
In addition, after the

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Transition line section tunnel CRD (Cross Diaphragm) construction method
  • Transition line section tunnel CRD (Cross Diaphragm) construction method
  • Transition line section tunnel CRD (Cross Diaphragm) construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0028] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0029] In the embodiment of the present invention, the civil air defense section of the interval tunnel, the crossover section 1, the crossover section 2, and the crossover section 3 are constructed by the CRD method, and each pilot tunnel is constructed by the step method. Before the grouting of each row of advanced small conduits, the face outside the core soil range of the upper step is closed with C20 concrete (thickness 50mm). Each steel frame joint is eq...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

PropertyMeasurementUnit
Thicknessaaaaaaaaaa
Login to view more

Abstract

The invention discloses a transition line section tunnel CRD (Cross Diaphragm) construction method. The tunnel face outside the range of core soil of upper bench is closed by C20 concrete (50mm in thickness), before the grouting of the advanced small pipes in each row. A locking anchor pipe is arranged at a steel frame joint, and the anchor pipe is a steel perforated pipe shown in the description,where L is 2.0m. The front-back staggered space between pilot tunnels is not less than 10m, and the specific staggered length is adjusted appropriately according to the cross section length. Residuesbelow the foundation must be cleared before mounting the steel frame, the overexcavation part is filled properly by sprayed concrete, then the steel frame is located on the sprayed concrete cushion layer, so as to prevent overall sinking of the steel frame or sinking of the two non-uniform sides. the running tunnel excavation footage is equal to the grille space; a civil defense section, a transition line section 1, a transition line section 2 and a transition line section 3 are subjected to CRD construction; each pilot tunnel is built by the benching tunneling method; the construction is carried out under the principles of advanced pipe, strict grouting, short footage, strong support, early closing and frequent measurement', thereby guaranteeing safe and smooth tunnel construction.

Description

technical field [0001] The invention relates to the technical field of subway tunnel construction, in particular to a CRD method construction method for a crossing section tunnel. Background technique [0002] In the construction of subway tunnels, the cross-section tunnel needs to be excavated with a large section using the mining method to meet the requirement that the main line section and the parking line are in the same large-section tunnel. The large-section excavation generally adopts the middle partition wall method (CD method) or Cross partition wall method (CRD method), CD method is a construction method in which one side of the tunnel is excavated in sections first, and the partition wall is constructed, and then the other side is excavated in sections in a long-span tunnel with weak surrounding rock. The CRD method is a construction method in which in a long-span tunnel with weak surrounding rock, one side of the tunnel is excavated in sections, and the middle pa...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E21D9/00E21D11/00
CPCE21D9/00E21D9/001E21D11/003
Inventor 杨祥亮蔡志勇张亮薛春苗李海峰王涛杨海健郭玉海王牧月张晟源陈雪峰李星晨吕金彪张涛王英波苏世宗石文正王越张建珍李文新庞梦月姜宁宁李丹丹
Owner BEIJING MUNICIPAL CONSTR
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products