Pile-pulling equipment for water conservancy projects
A technology for water conservancy engineering and equipment, which is applied in infrastructure engineering, sheet pile walls, buildings, etc., can solve problems such as poor economy, inconvenient use of pile pulling machines, and low pile pulling efficiency.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0050] Such as figure 1 Shown, a kind of hydraulic engineering pile pulling equipment, comprises left side plate 1, right side plate 2, top plate 3, supporting plate 4 and the clamper 5 for clamping pile body, described left side plate 1 and right side plate The side plates 2 are integrated with the top plate 3, the supporting plate 4 is located between the left side plate 1 and the right side plate 2, and the left side plate 1 and the right side plate 2 are provided with chute 6, The chute 6 is respectively embedded in the left side plate 1 and the right side plate 2, and the left side plate 1 and the right side plate 2 are all connected with the chute 6 by bolts, and the chute 6 is provided with The slider 7 that slides on the top, the slider 7 is fixedly connected with the support plate 4, and the support plate 4 is slidably connected with the left side plate 1 and the right side plate 2 through the slider 7, and the holder 5 is located above the supporting plate 4, a firs...
Embodiment 2
[0063] Such as Figure 1-2Shown, a kind of hydraulic engineering pile pulling equipment, comprises left side plate 1, right side plate 2, top plate 3, supporting plate 4 and the clamper 5 for clamping pile body, described left side plate 1 and right side plate The side plates 2 are integrated with the top plate 3, the supporting plate 4 is located between the left side plate 1 and the right side plate 2, and the left side plate 1 and the right side plate 2 are provided with chute 6, The chute 6 is respectively embedded in the left side plate 1 and the right side plate 2, and the left side plate 1 and the right side plate 2 are all connected with the chute 6 by bolts, and the chute 6 is provided with The slider 7 that slides on the top, the slider 7 is fixedly connected with the support plate 4, and the support plate 4 is slidably connected with the left side plate 1 and the right side plate 2 through the slider 7, and the holder 5 is located above the supporting plate 4, a fi...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 

