Construction method of one-time pouring and forming of composite member concrete
A technology of combined components and construction methods, which is applied in the processing of building materials, construction, building construction, etc., can solve the problems of concrete components such as bulging, small spacing of separation joints, deformation, etc., to simplify the construction process, speed up the construction progress, Guarantee the effect of appearance quality
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0032] In order to facilitate the understanding of the present invention, the following will be described in conjunction with the accompanying drawings and embodiments.
[0033] refer to Figure 1 to Figure 3 It can be seen that the present invention discloses a construction method for one-time pouring of composite component concrete, comprising the following steps:
[0034] Step 101: Binding the reinforcement skeleton 11 of each component unit in the combined component 1;
[0035] Step 102: install the steel frame 11 of each component unit that has been bundled at the position to be poured of the corresponding component unit, and a separation joint is formed between the adjacent steel frame 11;
[0036] Step 103: installing filling material 2 at the separation joint, the filling material 2 protruding from the outside of the reinforcement frame 11;
[0037] Step 104: installing a formwork on the outside of the composite member 1, so that the part of the filling material 2 pr...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


