Shallow-buried underground excavation construction method for arc-shaped variable-section tunnels in rock-filled strata

A shallow buried excavation and construction method technology, which is applied in tunnels, tunnel linings, underground chambers, etc., can solve the problems that arc-shaped variable-section tunnels cannot be constructed in rock-filled strata, shorten the length of excavation, improve construction accuracy, Solve the effect of too long setting length

Active Publication Date: 2018-11-02
SHENZHEN MUNICIPAL DESIGN & RES INST
View PDF6 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0010] The object of the present invention is to provide a construction method for shallow-buried arc-shaped variable-section tunnels in rock-filled strata to solve the problems existing in the above-mentioned prior art, and to solve the problem of arc-shaped variable-section tunnels in rock-filled strata that do not have open excavation conditions in urban areas. The problem that the tunnel cannot be constructed

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Shallow-buried underground excavation construction method for arc-shaped variable-section tunnels in rock-filled strata
  • Shallow-buried underground excavation construction method for arc-shaped variable-section tunnels in rock-filled strata
  • Shallow-buried underground excavation construction method for arc-shaped variable-section tunnels in rock-filled strata

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0037] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0038] The object of the present invention is to provide a construction method for shallow-buried arc-shaped variable-section tunnels in rock-filled strata to solve the problems existing in the above-mentioned prior art, and to solve the problem of arc-shaped variable-section tunnels in rock-filled strata that do not have open excavation conditions in urban areas. The problem that the tunnel cannot be constructed.

[0039] In order to make the above objects, f...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a shallow-buried underground excavation construction method for arc-shaped variable-section tunnels in rock-filled strata. The shallow-buried underground excavation construction method includes steps of excavating and constructing first vertical shafts and second vertical shafts; building first-group pipe sheds in the first vertical shafts until the first-group pipe sheds reach second pipe shed work rooms, and building second-group pipe sheds in the second vertical shafts until the second-group pipe sheds reach first pipe shed work rooms; carrying out underground excavation construction until the second-group pipe sheds reach the first pipe shed work rooms; changing pipe shed construction directions in the first pipe shed work rooms and building third-group pipe sheds; lapping top pipe sheds of the third-group pipe sheds with the first-group pipe sheds and allowing lateral pipe sheds of the third-group pipe sheds to exceed the second pipe shed work rooms and completely carrying out advanced pipe shed support on the second pipe shed work rooms; carrying out underground excavation construction until the third-group pipe sheds reach the second pipe shed work rooms; building lateral pipe sheds of fourth-group pipe sheds in the second pipe shed work rooms and completely carrying out advanced pipe shed support on arc-shaped widened section tunnels. The shallow-buried underground excavation construction method has the advantages that the pipe shed work rooms are set, the pipe sheds of the arc-shaped variable-section tunnels are built and lapped in oppositedirections, and accordingly the difficult problem of incapability of constructing advanced pipe sheds when shallow-buried underground excavation construction is carried out on existing arc-shaped variable-section tunnels can be solved by the aid of the shallow-buried underground excavation construction method.

Description

technical field [0001] The invention relates to the technical field of tunnel construction methods, in particular to a construction method for shallow-buried tunnels with arc-shaped variable cross-sections in rock-fill formations. Background technique [0002] With the development and construction of urban underground space, there are more and more projects such as urban underground ring roads, vehicle communication passages, and street crossing tunnels, such as the underground road of Wangjiadun Business District in Wuhan, the Wanbo underground ring road in Panyu, and the Qianhai underground ring road in Shenzhen. , Urban underground construction generally adopts construction methods such as open cut method, mine method, shield method, pipe jacking method, shallow buried and underground excavation method. [0003] The open cut method is to excavate foundation pits or trenches from the surface down to the design elevation, then pour underground structures at the excavated pr...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E21D9/00E21D11/14
CPCE21D9/00E21D11/14
Inventor 王建新彭琦王雷黄夏寅唐超华陈鸿曹智明
Owner SHENZHEN MUNICIPAL DESIGN & RES INST
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products