Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

94results about How to "Solve length" patented technology

RFID (Radio Frequency Identification Device) based seafood supply chain traceability system under exclusive shop direct sales model

The invention discloses an RFID (Radio Frequency Identification Device) based seafood supply chain traceability system under an exclusive shop direct sales model, comprising a client, a server and a backend database which are all in network connection; the client comprises RFID reader-writers, an RFID electronic label and a client computer, wherein the RFID reader-writer is in network connection with a plurality of RFID electronic label networks, and a plurality of RFID read-writers are in network connection with the client computer; the server comprises a culture subsystem, a processing subsystem, a delivery subsystem, an exclusive shop subsystem, a consumer and controlling authority subsystem and a management subsystem, wherein the management subsystem is respectively connected with the culture subsystem, the processing subsystem, the delivery subsystem, the exclusive shop subsystem and the consumer and controlling authority subsystem, and the culture subsystem, the processing subsystem, the delivery subsystem, the exclusive shop subsystem and the consumer and controlling authority subsystem are in network connection. The invention has the advantages of high speed, high efficiency, convenient management, capability of tracking relevant information of each link of a supply chain, and the like.
Owner:SOUTH CHINA UNIV OF TECH

Bond type anchorage and anchoring method for anchoring fibre reinforced plastic reinforcement or bracing cable

The present invention relates to an adhesive anchoring unit and an anchoring method for anchoring fiber reinforcement plastic bar or cable, an end cover is arranged at one end of the anchoring unit and a sleeve with a locating hole is arranged at the other end of the anchoring unit. An internal cone chamber is arranged in the sleeve, and a nut is arranged surrounding the sleeve provided with a mortar filling hole and a ventilation hole. The fiber reinforcement plastic bar or cable passes through the locating hole and one end in the internal cone chamber was cut into two halves, which are inserted with a wedge to become a wedge form. A starting section of the half of one end of the bar or cable is coated with a retaining ring and the section passing through the locating hole is coated with a thin wall aluminum sleeve tube and active powder concrete is filled in the internal cone chamber of the sleeve. The method is described as follows: after the bar or cable shaft passes through the sleeve of the anchoring unit, a pretension is required on the sleeve, and the active powder concrete is added into the sleeve. The present invention improves anchoring performances of the adhesive media and the FRP bar, therefore, the anchoring length is reduced, the structure is simple, the use is convenient, the present invention is safe and reliable, the cost is low and the PRC manufacturing and maintenance is easy.
Owner:HUNAN UNIV

Method for automatically adjusting arc length of slope characteristic type pulse consumable electrode gas shielded welding

InactiveCN101612688ASolve lengthSolving Arc Voltage ProblemsArc welding apparatusCharacteristic typePower flow
The invention relates to a method for automatically adjusting voltage of electric arc of slope characteristic type pulse consumable electrode gas shielded welding, which mainly quantitatively adjusts the automatic adjustment intensity of the arc length and builds a slope characteristic type welding power supply control system through an arc length automatic adjusting model by an external characteristic slope algorithm of a welding power supply. The method takes the external characteristic slope as a criterion, takes the peak current time as a control quantity, and makes the voltage of the electric arc and the arc length automatically adjusted to a stable working point in the pulse consumable electrode gas shielded welding process. The method has the advantages of simpleness, effectiveness, adaptive parameter adjusting function and strong adaptability, and can be used for MIG welding, MAG welding and CO2 gas shielded welding.
Owner:BEIJING INSTITUTE OF PETROCHEMICAL TECHNOLOGY

Automatic feeding device, automatic feeding-type punch press and automatic feeding method

The invention relates to an automatic feeding-type punch press which comprises automatic feeding devices. The automatic feeding devices are mounted on two sides of a die of the punch press in an alignment manner respectively. Each automatic feeding device comprises a support provided with a worktop on the top face; sliding seats are arranged on screw rod transmission mechanisms mounted on the worktops; feeding sliders are mounted on the sliding seats through guide sliding rails perpendicular to the screw rod transmission mechanisms; plate fixing devices are arranged above the feeding sliders; each feeding slider slides on the corresponding guide sliding rail through two feeding cylinders respectively arranged on two sides of the feeding slider; motors of the automatic feeding devices are controlled by a control system of an electrical control cabinet to drive the screw rod transmission mechanisms to enable the sliding seats to slide, and the feeding cylinders are utilized to control the feeding sliders to slide to complete automatic feeding of plates. The automatic feeding-type punch press is adopted to punch workpieces, the automatic feeding devices are simple in structure, small in occupied space and applicable to processing of various plates, and the die of the punch press is convenient to maintain and easy for workers to operate.
Owner:HANGZHOU KINGNET ELECTROMECHANICAL

Hot spraying aluminium-zinc alloy wire rod and method for making same

The invention relates to a heat spraying aluminium zinc alloy wire rod composition and its preparing process, wherein the constituents (by weight percentage) of the wire rod include Al 54-56%, 0.004%<=M<=1.08%, impurity whose total amount is less than 1%, and balancing Zn, M is any one or the combination of RE, Mg, Ti or B.
Owner:INST OF OCEANOLOGY - CHINESE ACAD OF SCI

Flexible fire-proof cable and its producing process and producing device

The invention is a flexible fireproof cable and its producing process as well as its producing equipment. It uniformly distributes a group of metal wire cores, which are mutually isolated and coated in the vertical direction by mica tape insulating layer and then coats a metal tape outside, the metal tape is folded annularly and closed vertically by a welding line, thus composing the flexible fireproof cable. If it needs a better bending property, it can roll lines on a smooth metal protective cover. Its producing equipment is composed mainly of a twisted wire winder, a cable winder and a metal protective cover coat-welding machine connected in series in sequence. It solves the problems of high temperature resistance, safety and environmental protection as well as process complexity, cable hardness, cable length, and insulating resistance. It can not fire, burn and produce smoke frog and harmful substances even if the surrounding substances have been firing and burning, so it is a permanent fireproof safe environmental protection cable.
Owner:上海胜武电缆有限公司

Preparation method of chalcogenide glass tapered fibers

ActiveCN104609723AEasy to solveSolve the core diameterGlass making apparatusTemperature controlFiber
The invention discloses a preparation method of chalcogenide glass tapered fibers. Chalcogenide glass fibers are tapered by the aid of accurate temperature control of a specific electric-heating coil and traction of a precision stepping motor, important parameters such as taper zone lengths, taper zone outer diameters and the like of the tapered fibers are controlled through control on the heating temperature and the tapering traction speed, and the chalcogenide glass tapered fibers with different taper zone lengths and taper zone outer diameters are drawn accurately. The method is simple in technology, high in operability, good in repeatability and high in accuracy and can effectively solve problems that the chalcogenide glass fibers are broken easily during tapering, fiber core diameters and taper zone lengths are difficult to control accurately and the like, the fiber core diameters of the prepared chalcogenide glass tapered fibers with nanoscale or submicron diameters range from 700 mu m to 1,000 mu m, the taper zone lengths range from 3 cm to 7 cm, the production cycle is short, the success rate is high, the chalcogenide glass tapered fibers can be applied to new technical fields of coupling of micro-waveguides, generation of super-continuum spectrum and the like, and research and application fields of the chalcogenide glass tapered fibers are greatly extended.
Owner:NINGBO UNIV

Communication method based on polarization code

ActiveCN108092742AThe length can be adjusted arbitrarilyShorten communication timeError preventionComputer hardware
The invention discloses a communication method based on a polarization code. The communication method comprises the following steps: firstly, constructing an initial polarization code according to thenumber K of information bits, the number J of CRC bits and the encoding length N, wherein the initial polarization code comprises N coded bits, the positions of the information bits and the positionsof the CRC bits in the N coded bits are determined, and K + J is smaller than or equal to N; determining the importance of each coded bit according to the contribution of each coded bit; according tothe importance degree of each coded bit, punching partial coded bits with relatively low importance in the initial polarization codes to obtain a new punched polarization code, and the length of thecoded bits included in the new punched polarization codes is between K + J and N, and sending the new punched polarization code; or according to the importance degree of each coded bit, sending each coded bit according to the order of importance from high to low. According to the communication method based on the polarization code disclosed by the invention, the communication time of two parties can be reduced by combining the importance of the coded bits and hybrid retransmission, so that the retransmission efficiency can be improved.
Owner:HUAZHONG UNIV OF SCI & TECH

Five-junction solar energy cells including DBR structure

The invention discloses a five-junction solar energy cell including a DBR structure. According to the cell, a Ge single crystal slice is taken as a substrate, the Ge substrate is sequentially provided with a GaInAs / GaInP buffer layer, an AlGaAs / GaInAs DBR, a Ga1-3xIn3xNxAs1-x sub cell, an AlAs / AlGaAs DBR, a Ga1-3yIn3yNyAs1-y sub cell, an AlGaInAs sub cell and an AlGaInP sub cell, wherein the AlGaAs / GaInAs DBR is used for reflecting long-wave photons, and the AlAs / AlGaAs DBR is used for reflecting middle / long-wave photons. Through the cell, the photons can be absorbed and utilized secondarily by the sub cells, sub cell collection efficiency is improved, so photoelectric conversion efficiency of the five-junction solar energy cell is improved, moreover, thickness of the sub cells can be reduced, cell production efficiency is improved, and cell production cost is reduced.
Owner:ZHONGSHAN DEHUA CHIP TECH CO LTD

Method and device for scheduling queue

The embodiment of the invention discloses a method and a device for scheduling a queue, relates to the technical field of data transmission, and solves the problem of high delay jittering of the queue in the prior art. The method comprises the following steps of: after scheduling at each time, acquiring a target queue from a queue to be scheduled; if a granularity consumption parameter which corresponds to the target queue is greater than a first threshold value which is pre-set, and the number of waiting queues is zero, setting the target queue as the waiting queue; if the granularity consumption parameter which corresponds to the target queue is greater than the first threshold value and smaller than the granularity consumption parameter which corresponds to the waiting queue, setting the target queue as the waiting queue, setting the original waiting queue as the queue to be scheduled, and scheduling the queue to be scheduled. The invention is applicable to the technical field of deficit round robin scheduling.
Owner:HUAWEI TECH CO LTD

Method for forming multistage deep step

InactiveCN102543682ASolve lengthSolve the problem of limited stepsSemiconductor/solid-state device manufacturingPhotoresistChemistry
The invention relates to a method for forming a multistage deep step, which comprises the following steps of: depositing a first film on a substrate; coating first photoresist, and photoetching the first photoresist to form a first wind; removing the first film within the first window through etching, and then removing the first photoresist; depositing a second film on the surface of the structure; coating second photoresist; and etching the second photoresist to form a second window, wherein the position of the second window is corresponding to that of the first window, and the width of the second window is smaller than that of the first window; removing the second film in the second window through etching, and then removing the second photoresist; etching the substrate by using the second film as a mask to form a first step on the substrate; removing the second film, and etching the substrate by using the first film as a mask to form a second step on the substrate; and removing the first film. In the method, multiple films are respectively used as etching baffle layers for each step, the problem of limited step length and steps is solved, and a multistage deep step structure of a single material is made.
Owner:ADVANCED SEMICON MFG CO LTD

Supercritical extraction kettle capable of achieving automatic loading and unloading

The invention discloses a supercritical extraction kettle capable of achieving automatic loading and unloading. The supercritical extraction kettle comprises a main body part, a material barrel part, a lifting part and an opening and closing hoop part, wherein the material barrel part is located in an inner cavity of the main body part, and the lifting part is located below the main body part, and the opening and closing hoop part is located at the joint of the main body part and the lifting part. According to the supercritical extraction kettle capable of achieving automatic loading and unloading, the material barrel part is arranged in and taken out of the lower portion of the main body part through the lifting part so that the loading and unloading of the supercritical extraction kettle can be achieved; the lifting part is reasonable in structural arrangement, and lifting is convenient and fast.
Owner:钱如树

High-temperature superconducting cable and joint connecting method thereof

The invention relates to a high-temperature superconducting cable and a joint connecting method thereof, belongs to the technical field of high-temperature superconducting materials, and solves the problems of large size, high resistance, slow heat conduction, high processing difficulty and poor joint stability of the existing high-temperature superconducting cable joint. The joint connecting method comprises the following steps: 1, stacking and welding a plurality of high-temperature superconducting strips end to end in sequence to form a single-layer long strip; 2, stacking a plurality of single-layer long strips, wherein welding points of every two adjacent layers of single-layer long strips are arranged at intervals in the horizontal direction; 3, binding the plurality of stacked single-layer long strips into a high-temperature superconducting stack by using a binding piece. The invention also provides a high-temperature superconducting cable based on the joint connection method. The connector connecting method is simple in manufacturing process and easy in machining, and the cable connector manufactured through the connector connecting method is small in size, small in resistance, high in heat conduction speed and good in application prospect.
Owner:INST OF HIGH ENERGY PHYSICS CHINESE ACADEMY OF SCI +2

Drilling bit spiral impact device

The invention provides a drilling bit spiral impact device which comprises an outer casing pipe, an impact hammer and a lower connector which are mounted in the outer casing pipe in sequence in the vertical direction; a power input shaft is arranged at the center of the impact hammer; the power input shaft is movably connected with the impact hammer and drives the impact hammer to rotate; the impact hammer is connected with the outer casing pipe through a guide mechanism; the impact hammer moves up and down along the power input shaft under the action of the guide mechanism; the guide mechanism comprises a saw-toothed ring groove which is formed by spiral line grooves and vertical grooves which are alternatively formed and two or more guide blocks positioned in the saw-toothed ring groove; the spiral line grooves and the vertical grooves are identical in number and are mutually communicated; the guide blocks are uniformly distributed on the inner wall of the outer casing pipe and the saw-toothed ring groove is formed in the side surface of the impact hammer. The drilling bit spiral impact device does not need quick-wear parts like springs, is simple in structure, convenient to maintain, low in cost, suitable for coring of hole sections of various depths and not influenced by hole depth and pressure change of a water column, and can improve the rock breaking effect and improve the roundtrip meterage length.
Owner:CHINA UNIV OF GEOSCIENCES (WUHAN)

Fire-fighting device

The invention provides a fire-fighting device, and relates to the technical field of fire-fighting devices. The fire-fighting device comprises a fire-fighting rescue working platform, fans, a mechanical arm, a fire-fighting water cannon and a life-saving pipeline, wherein the fan is used for providing lifting power for the fire-fighting rescue working platform; the mechanical arm is used for assisting in stabilizing the fire-fighting rescue working platform and establishing a trestle channel; the fire-fighting water cannon is used for spraying a fire extinguishing agent; and the life-saving pipeline is used for enabling personnel to slide from the fire-fighting rescue working platform to the ground. According to the fire-fighting device, the fans generate power to enable the fire-fightingrescue working platform to become a large-scale unmanned aerial vehicle; the mechanical arm achieves accurate and stable stopping for high-altitude hovering of the fire-fighting rescue working platform; the life-saving pipeline is a lower-sliding soft channel, and the rescue efficiency is improved; and the fans are used as the lifting power of the fire-fighting rescue working platform, so that theproblems of limit limitation of the traditional vehicle-mounted mechanical long-arm operation on the physical weight, extension length, lifting height, safety guarantee and the like are solved.
Owner:江苏科达机械有限公司

Proximity sensor inductance resolving method

An inductance resolving method for a proximity sensor belongs to the field of proximity sensors and is characterized in that a digital waveform with adjustable amplitude and frequency is generated through an excitation waveform module, and is sent to the proximity sensor after being driven by a coil excitation circuit; an electric feedback signal of the proximity sensor is fed back to the resolving algorithm in a digital mode after being detected and sampled; resistance and inductance parameters of the coil are directly separated through a resolving algorithm. A proximity sensor and a calibration load are switched by using multiple channels; the calibration load comprises a short circuit resistor, an open circuit resistor and a standard resistor, and the proximity sensor is driven by usinga low-frequency sine wave, so that the influence of distributed capacitance of a connecting cable connected with the inductive proximity sensor in series on the measurement precision can be ignored,and the problems of long-time measurement precision drift and sensitivity to the length of the cable of a sensor measurement circuit are effectively solved; meanwhile, the inductance value is obtainedby calculating the impedance of the inductor, and the high-low temperature error problem is avoided.
Owner:西安润鑫航空科技有限公司

Plug-in cable elbow type head detacher

The invention discloses a plug-in cable elbow type head detacher. The plug-in cable elbow type head detacher comprises a force application support, wherein a hoop for hoping a cable elbow type head isarranged at the lower part of the force application support; and a positioning screw capable of reciprocating motion along the axial direction of the hoop is arranged on the top of the force application support. The plug-in cable elbow type head detacher disclosed by the invention has the advantages of simple structure, low manufacturing cost, good detaching effect, high detaching efficiency, high practicability and the like, and is applicable for elbow type head detaching of switch cabinets of different factories; and according to the plug-in cable elbow type head detacher disclosed by the invention, the disassembling time of the whole elbow type head is reduced to be 20 min from 70 min without damaging the elbow type head.
Owner:STATE GRID HUNAN ELECTRIC POWER +1

Cutting system for prefabricated middle locking type rock mass fractures with different geometrical characteristics

The invention discloses a cutting system for prefabricated middle locking type rock mass fractures with different geometrical characteristics. The cutting system comprises a driving case; and a cutting engine, a gear engine, a sliding rail set and a cutting mechanism are installed in the driving case. The cutting mechanism comprises a carborundum fret saw and a U-shaped bevel protractor lower disc installed on the sliding rail set in a sliding mode. A sliding groove is formed in the top face of the U-shaped bevel protractor lower disc, and a U-shaped bevel protractor upper disc is installed on the top face of the U-shaped bevel protractor lower disc in a sliding mode through the sliding groove. Adjusting assemblies are further installed at the two ends of the U-shaped bevel protractor upper disc. Rock is fixedly arranged on the adjusting assemblies. According to the cutting system, the integrity of the prefabricated middle locking type intermittent fracture rock mass is ensured; the cutting mechanism and a driving assembly are matched for use, so that the problem that the joint inclination angle and length are difficult to accurately control is solved; and the inclination angle and the length of the fracture can be accurately controlled and cut when the fracture is prefabricated, meanwhile, the integrity of the rock mass is guaranteed, and operation is simple and easy to operate.
Owner:INST OF DISASTER PREVENTION +1

Large-span main beam bidirectional rapid incremental launching equipment system and construction method

The invention belongs to the technical field of main beam incremental launching construction in bridge construction, and particularly relates to a large-span main beam bidirectional rapid incremental launching equipment system and a construction method. The system comprises a supporting system, a power system and an accurate positioning system. The supporting system comprises stand columns, an unloading device, cross beams, longitudinal beams and distribution beams, each stand column is arranged on a pier or on a foundation between two piers, one cross beam is connected between the tops of each row of stand columns, the longitudinal beams are installed on the cross beams, the distribution beams are installed on the longitudinal beams, and a main beam is placed on the distribution beams. The power system comprises a pushing counter-force base, a jack, a deviation rectifying device, a flexible pushing device, an anchor pulling structure and a traction bundle. The accurate positioning system comprises a stand column, a stay cable and beam anchor beams, the stand column is fixed to the middle of the main beam, the beam anchor beams are installed at the two ends of the main beam respectively, and the stay cable is connected between the beam anchor beams and the top of the stand column. Construction of guide beams and the combination section of the guide beam and the main beam is omitted, and the construction quality of the main beam is ensured.
Owner:CHINA RAILWAY NO 3 GRP CO LTD +1

18-month refueling loading method for pressurized water reactor first-cycle boracic core

The invention discloses an 18-month refueling loading method for a pressurized water reactor first-cycle boracic core. The pressurized water reactor first-cycle boracic core is composed of 121 sets offuel assemblies. The first cycle fuel assembly is divided into four regions according to the U-235 enrichment degrees, the U-235 enrichment degrees of the four regions are 1.9%, 2.6%, 3.1% and 3.7% respectively, the fuel assemblies are the sets 21, 32, 44 and 24, the first cycle core adopts the high-leakage loading mode, and solid burnable poison adopted by the first cycle core is borosilicate glass rods; the problem that due to three-region arrangement, a nuclear enthalpy rise factor meeting the requirement is hard to obtain is solved, the technical requirement for the first-cycle 18-month long-period refueling design is met while it is ensured that a reactor has the high safety, and the cycle length is prolonged to 473 effective full power days from annual refueling 387 effective full power days.
Owner:NUCLEAR POWER INSTITUTE OF CHINA

Downhole integral launching method for shield tunneling machine

The invention discloses a donwhole integral launching method for a shield tunneling machine. The shield tunneling machine comprises a shield tunneling machine body, a connection bridge and a trolley group. The length of a launching well is smaller than the length needed by integral launching of the shield tunneling machine. The method includes that the trolley group comprises at least two trolleys; at least one trolley is disassembled into a first part and a second part, the first part is fixed on one side of another trolley, and the second part is fixed on the other side of the trolley to form a trolley combination; the trolley combination can move in the launching well along the launching direction; the shield tunneling machine is launched integrally in the launching well after the steps are completed. The donwhole integral launching method has the advantages that the trolleys of the shield tunneling machine are simple to refit and recover, low in cost and high in launching speed, the problems of short length of the shield launching well and narrowness of a construction site are solved, construction period can be shortened and construction cost can be reduced.
Owner:CHINA CONSTR FIRST GROUP THE FIFTH CONSTR +1

Sliding installation method for large span section steel beam

ActiveCN104727563ASolve lengthSolve the difficulties that cannot be constructedBuilding material handlingWinchPulley
The invention provides a sliding installation method for a large span section steel beam. The sliding installation method comprises the steps that two sliding rails are installed on the two sides of the section steel beam to be installed and positioned respectively; rail ribs are arranged on the sliding rails; base plates arranged on the rail ribs and used for bearing the section steel beam are arranged in the sliding rails; the section steel beam arranged on the base plates is arranged on the two sliding rails in a span mode; turning supports and pulleys arranged on the turning seats are installed at the ends of one sides of the sliding rails; winches used for driving the section steel beam to slide are arranged, and steel wire ropes of the winches penetrate through the pulleys and then are tensioned to the base plates along the sliding rails; according to the installing and positioning points of the section steel beam, the section steel beam is slide in place through the winches. By means of the design of the turning supports and the pulleys, the steel wire ropes of the winches can be turned, the transverse and longitudinal space is fully used, and the difficulty that construction cannot be carried out due to the insufficient longitudinal sliding length of a roof is overcome.
Owner:CHINA CONSTR EIGHT ENG DIV CORP LTD

Battery cell detection device

The invention discloses a battery cell detection device, which belongs to the technical field of battery cell detection. The battery cell detection device comprises a first rotary transporting apparatus and a detection system, wherein the first rotary transporting apparatus can adsorb a plurality of battery cells and control the plurality of battery cells to auto-rotate and to rotate along the center of the first rotary transporting apparatus; and the detection system detects whether the plurality of battery cells transported on the first rotary transporting apparatus are qualified or not. Thebattery cell detection device aims at solving the problems in the prior art that the battery cell detection device is excessively long in the entire length and large in size.
Owner:WUXI AOTEWEI INTELLIGENT EQUIP CO LTD

Suspension structural microwave filter and manufacturing method thereof

The invention provides a suspension structural microwave filter. The suspension structural microwave filter comprises an upper silicon wafer and a lower silicon wafer; a concave cavity is etched on the lower surface of the upper silicon wafer, and used for forming an encapsulation cap structure; a dielectric film is deposited on the upper surface of the lower silicon wafer; an interdigital electrode pattern is formed on the dielectric film, wherein the silicon substrate below the dielectric film on the upper surface of the lower silicon wafer is eliminated, so that the suspension state of thedielectric film is formed; and the upper silicon wafer and the lower silicon wafer are stacked and assembled through an alignment bonding process. The suspension structural microwave filter provided by the invention has the advantages of being small in volume, low in loss and high in performance.
Owner:INST OF MICROELECTRONICS CHINESE ACAD OF SCI

Waste and slag collection device for numerical control cutting machine

The invention discloses a waste and slag collection device for a numerical control cutting machine. The waste and slag collection device comprises a bracket weldment, an upper roller assembly and a lower roller assembly for supporting clamping as well as two precision roller chains for power input are symmetrically arranged on the left and right sides of the bracket weldment correspondingly, and shovel weldments used for collecting waste and slag and capable of carrying out multi-level adjustment are arranged on the front and rear sides of the bracket weldment correspondingly. According to thewaste and slag collection device for the numerical control cutting machine, through driving of the precision roller chains, floating mechanisms symmetrically arranged form a shovel structure that cancarry out multi-level adjustment for the collection of the waste and the slag, the automatic operation is achieved, the work efficiency is greatly improved, the production costs are reduced, and thelimitation of the working time length and the sticking problem in the working process are solved; and meanwhile, through a way of two-way work, the work efficiency is further improved in the process of automation, and the waste and slag collection device has many advantages such as simple structure, high efficiency, multi-level adjustment and high adaptability.
Owner:梅塞尔切割焊接(中国)有限公司

Feeding manipulator of concrete mixer

The invention discloses a feeding manipulator of a concrete mixer. The feeding manipulator comprises a mechanical arm arranged at a mixing station and a flow guidance device mounted at the tail end ofthe mechanical arm. The mechanical arm is used for moving the position of the flow guidance device and adjusting the angle of the flow guidance device, so that the flexible action of the flow guidance device in the space is realized, and the material inlet hole of a mixing barrel is conveniently aligned. The flow guidance device comprises a material inlet hopper located below a discharging hopperand further comprises a flow groove communicating with a material outlet port of the material inlet hopper, and the launder is used for enabling concrete output by the discharging hopper to flow outof the launder after entering the material inlet hopper and to be loaded into the mixing barrel. According to the feeding manipulator, the feeding device is arranged in the mixing station, and the concrete is directly loaded through the feeding device after a mixer enters the mixing station, so that the mixer truck does not need to be provided with a feeding hopper and other devices, the problemsof cleaning, poor heat and moisture preservation and the like caused by loading of the feeding hopper on the mixer are solved, and spilling and leakage in the feeding process are reduced.
Owner:SHANDONG JINGTONG ENG MASCH CO LTD

Construction method for underground diaphragm wall of square

The invention provides a construction method for an underground diaphragm wall of a square. The construction method comprises the following steps of a reinforcement cage hoisting step and a counter-force box hoisting step, specifically, the reinforcement cage hoisting step comprises the following steps of setting a transverse suspension centre and a longitudinal suspension centre; judging whethera reinforcement cage meets the hoisting demand; carrying out ground bearing checking calculation of a construction load on a ground load and a foundation bearing capacity; carrying out checking calculation on stability of a crawler crane; mounting the reinforcement cage by using a single crane or a double crane; the counter-force box hoisting step comprises the following steps: carrying out hoisting checking calculation on the counter-force box and calculating a hoisting steel wire rope; configuring the counter-force box in section according to depth of a groove section; mounting the counter-force box; and pulling out the counter-force box. According to the construction method provided by the invention, reinforcement cages and counter-force boxes which are relatively long and relatively heavy can be constructed, so that the problem that reinforcement cages and counter-force boxes which are relatively long and relatively heavy cannot be constructed in the prior art is solved.
Owner:HONGRUN CONSTR GROUP STOCK

Shallow-buried underground excavation construction method for arc-shaped variable-section tunnels in rock-filled strata

The invention discloses a shallow-buried underground excavation construction method for arc-shaped variable-section tunnels in rock-filled strata. The shallow-buried underground excavation construction method includes steps of excavating and constructing first vertical shafts and second vertical shafts; building first-group pipe sheds in the first vertical shafts until the first-group pipe sheds reach second pipe shed work rooms, and building second-group pipe sheds in the second vertical shafts until the second-group pipe sheds reach first pipe shed work rooms; carrying out underground excavation construction until the second-group pipe sheds reach the first pipe shed work rooms; changing pipe shed construction directions in the first pipe shed work rooms and building third-group pipe sheds; lapping top pipe sheds of the third-group pipe sheds with the first-group pipe sheds and allowing lateral pipe sheds of the third-group pipe sheds to exceed the second pipe shed work rooms and completely carrying out advanced pipe shed support on the second pipe shed work rooms; carrying out underground excavation construction until the third-group pipe sheds reach the second pipe shed work rooms; building lateral pipe sheds of fourth-group pipe sheds in the second pipe shed work rooms and completely carrying out advanced pipe shed support on arc-shaped widened section tunnels. The shallow-buried underground excavation construction method has the advantages that the pipe shed work rooms are set, the pipe sheds of the arc-shaped variable-section tunnels are built and lapped in oppositedirections, and accordingly the difficult problem of incapability of constructing advanced pipe sheds when shallow-buried underground excavation construction is carried out on existing arc-shaped variable-section tunnels can be solved by the aid of the shallow-buried underground excavation construction method.
Owner:SHENZHEN MUNICIPAL DESIGN & RES INST
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products