Concrete pouring method for water turbine runner chamber
A pouring method and runner chamber technology, applied in hydroelectric power generation, water conservancy projects, hydropower stations, etc., can solve the problems of difficult and difficult implementation of old water turbine units, to ensure safety and stability, reliable use, The effect of preventing partial voids
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0014] Embodiment 1: A concrete pouring method for the runner chamber of a hydraulic turbine, the method comprising the following steps: 1) drilling the grouting pipe 1; 2) pre-burying the grouting pipe 1 in the pit of the runner chamber 2; 3) Concrete pouring is performed through the grouting pipe 1; 4) The pouring is completed.
[0015] Wherein, in order to facilitate layer-by-layer pouring, in the step 1), a plurality of grouting holes 3 are made on the grouting pipe 1 by a punching machine, and adjacent grouting holes 3 are formed on the same grouting pipe 1 The distance between them is greater than 50cm, and the diameter of each pulp outlet hole 3 is not less than 40mm.
[0016] In order to facilitate pouring, in the step 2), the grouting pipe 1 is vertically inserted into the pit of the runner chamber 2, and is arranged adjacent to the inner wall of the pit of the runner chamber 2.
[0017] In order to make pouring more uniform and prevent gaps, at least 8 grouting pipe...