Excavation piling and filling method
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- CHINA 19TH METALLURGICAL CORP
- Publication Date
- 2018-12-28
- Estimated Expiration
- Not applicable · inactive patent
Smart Images

Figure 1 
Figure 2
Abstract
Description
technical field
[0001] The invention belongs to the field of pile foundation construction, in particular to a pouring method for hole-digging piles. Background technique
[0002] The construction process of the hole-digging pile is to drill a hole in the ground, put a steel cage in the hole, then extend the bottom end of the conduit into the bottom of the hole, and pour concrete into the hole from the top of the conduit. According to the construction specification, the silt at the bottom of the hole should be thoroughly removed after drilling, but it is difficult to completely remove the silt during the actual construction process. During the construction of the back cover, the first batch of concrete rushes out of the bottom of the conduit to flow and spread around the bottom of the hole, and is mixed with the flushing fluid in the hole to form a laitance dilution layer of a certain thickness, which forms a laitance on the top of the pile.
[0003] At present, superfilling...