A method for customizing the cross-sectional view of a pipe section by a template
A cross-sectional diagram and pipeline technology, applied in the field of optical wiring resource management, can solve problems such as unintuitive management, cumbersome operation, and error-prone
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment 1
[0043] Such as figure 1 As shown, the template-based method for customizing a cross-sectional view of a pipe section provided by the specific embodiment 1 of the present invention includes the following steps:
[0044] S100: Through the WEBGIS pipeline management system, download the communication resource information of the optical distribution network from the ODN network management server of the optical distribution network, such as: the spatial linear resources of the optical cable, the pipeline of the cable, the pipe trough or the pole, and the formation of these The line’s manholes, connection wells, electric poles, iron towers and other point resources, as well as pipe groups, pipe holes, and sub-pipes.
[0045] S200: Use the obtained communication resource information to obtain the number of rows and columns of the pipe hole arrangement in the pipe section section to be drawn, and generate the rectangular grid required for drawing the pipe section section view; according to ...
specific Embodiment 2
[0052] In step S100, the specific steps for downloading the communication resource information of the optical distribution network from the ODN network management server through the WEBGIS pipeline management system are as follows:
[0053] S101. After starting the ODN network management server and the WEBGIS system, the WEBGIS system informs the ODN network management server to package communication resource information, and judges the response result of the ODN network management server. If the ODN network management server responds to the notification successfully, then go to S102; if the response fails, then After a delay of 5 seconds, notify the ODN network management server to package the communication resource information again.
[0054] S102. The WEBGIS system waits for the progress of the ODN network management server packaging communication resource information, and judges whether the packaging communication resource information is successful, if the packaging communicatio...
specific Embodiment 3
[0059] In this specific embodiment 3, assuming that the specification of the current graphic template is the number of rows = R, the number of columns = C (R and C are both positive integers), the drawn grid is a square area with a side length of W, then step 200 is generated The detailed steps of the pipeline section are as follows:
[0060] S201. Determine a drawing coordinate system.
[0061] In the WEBGIS system display area, the upper left corner is the coordinate origin O, the coordinate origin O is the center, the right direction is the positive direction of the X axis, and the downward direction is the positive direction of the Y axis to determine the coordinate system.
[0062] S202. Draw a dotted line segment extending along the X axis direction.
[0063] First, determine the first dashed segment in the X-axis direction, which requires two coordinate points A1, Z1. A1 is the position of the coordinate origin O, Z1 is obtained after A1 is offset along the positive direction ...