A method for integrating design of concrete face slab structure of rockfill concrete face dam
A design method and technology of face dams, applied in design optimization/simulation, calculation, image data processing, etc., can solve problems such as data decimal point accuracy requirements, undiscovered, and misalignment of spatial point coordinates
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0017] The present invention will be described in detail below with reference to the drawings and embodiments.
[0018] like Figure 1-4 Shown, the present invention implements according to the following steps:
[0019] 1. Analyze the plinth structure of the panel and determine the construction edge:
[0020] The spatial structure of the face plate and plinth of the face rockfill dam is complex, but after careful analysis, there are still rules to follow. General structure of plinth see figure 1 :
[0021] Plinth structure conventional such as figure 1 As shown, the toe plate of the complex point also includes the inner toe plate. Regardless of the plinth structure, it is determined figure 1 The space section shape of the toe plate, the additional inner toe plate can be added according to the design needs, so the discussion of the inner toe plate is not of universal significance, so it is determined figure 1 The space section of the plinth shown is sufficient.
[0022]...
PUM
Login to View More Abstract