A Method for Evaluation of Mud Cake Quality Before Cementing
An evaluation method and quality evaluation technology, applied in the field of oil drilling, can solve the problems of inability to evaluate the quality of the mud cake, low adaptability of the flushing method, and inability to effectively flush the mud cake, etc., and achieve the effect of improving the effect.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0172] Based on the method provided in the embodiment of the present invention, this embodiment takes Gang XX-1 well as an example to illustrate the mud cake quality evaluation method before cementing.
[0173] The logging data of Well Gang XX-1 can be obtained according to the logging data, bottom pressure fitting and experimental data. The specific logging data are: the vertical depth of the well is 1500m, the outlet temperature of the drilling fluid is 38°C, and the density of the drilling fluid is 1.20 g / cm 3 , the formation compaction coefficient is 2.7×10 -4 , the initial time difference is 380μs, the measured acoustic time difference at the bottom of the well is 279μs, the pressure gradient of the overlying strata near the bottom of the well is 23.54KPa / m, the hydrostatic pressure gradient is 9.8KPa / m, and the Eaton coefficient is 0.3.
[0174] (1) Predict the bottom hole temperature and bottom hole pressure difference
[0175] According to the logging data of Well Ga...
Embodiment 2
[0193] Based on the method provided in the embodiment of the present invention, this embodiment takes the Gang XX-2 well as an example to illustrate the mud cake quality evaluation method before cementing.
[0194] The logging data of Well Gang XX-2 can be obtained according to the logging data, bottom pressure fitting and experimental data. The specific logging data are: the well vertical depth is 1800m, the drilling fluid outlet temperature is 40°C, and the drilling fluid density is 1.22g / cm 3 , the formation compaction coefficient is 2.72×10 -4 , the initial time difference is 385μs, the measured acoustic time difference at the bottom of the well is 289μs, the pressure gradient of the overlying strata near the bottom of the well is 23.74KPa / m, the hydrostatic pressure gradient is 9.8KPa / m, and the Eaton coefficient is 0.3.
[0195] (1) Predict the bottom hole temperature and bottom hole pressure difference
[0196] According to the logging data of Well Gang XX-2, and thr...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


