Integrated construction method of full-width inverted arch formwork based on tunnel trestle
A formwork and trestle technology, applied in the field of tunnel inverted arch trestle, can solve the problems of not being able to improve overall movement, reducing the construction efficiency of inverted arches, and consuming manpower and material resources, and achieve the effects of reducing personnel input, improving construction efficiency, and reducing labor intensity.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0035] Attached below Figures 1 to 11 The preferred embodiment of the present invention is further described, including the trestle main body 1, and also includes a full-width trolley 2, a full-width inverted arch formwork 3, an integral central groove formwork 4, an inverted arch layer sealing formwork 5, and a filling layer sealing formwork 6;
[0036] The full-width trolley 2 walks along the trestle main body 1 through the motor, and the oil cylinder at the bottom of the full-width trolley 2 is connected to the full-width inverted arch template 3 through the ear plate 9, which is the connection and driving mechanism between the trestle main body 1 and the full-width inverted arch template 3.
[0037] The arc shape of the full-width inverted arch formwork 3 completely fits the excavated tunnel section. The full-width inverted arch formwork 3 is composed of an arc formwork group 31, a hoop beam 32, and a longitudinal beam 33; the arc formwork group 31 is arranged on the hoop ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


