Unlock instant, AI-driven research and patent intelligence for your innovation.

Integrated construction method of full-width inverted arch formwork based on tunnel trestle

A formwork and trestle technology, applied in the field of tunnel inverted arch trestle, can solve the problems of not being able to improve overall movement, reducing the construction efficiency of inverted arches, and consuming manpower and material resources, and achieve the effects of reducing personnel input, improving construction efficiency, and reducing labor intensity.

Pending Publication Date: 2019-01-29
HUNAN WUXIN MACHINERY
View PDF0 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] With the continuous development of my country's railway tunnel construction technology, in order to effectively improve the stability and durability of the inverted arch structure and realize the full-width construction of the inverted arch at one time, the full-width pouring construction has become the basic requirement for tunnel construction. Traditional full-width inverted arch formwork construction Generally, small pieces of steel molds are used in combination. Manual assembly, disassembly, and reinforcement consume a lot of manpower and material resources, and cannot be lifted and moved as a whole; resulting in long construction time, at least four people and four hours for a single assembly, and demolition. It also takes at least four people and four hours. After the formwork is removed, traditional methods need to be used to move forward, which greatly reduces the construction efficiency of the inverted arch.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Integrated construction method of full-width inverted arch formwork based on tunnel trestle
  • Integrated construction method of full-width inverted arch formwork based on tunnel trestle
  • Integrated construction method of full-width inverted arch formwork based on tunnel trestle

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0035] Attached below Figures 1 to 11 The preferred embodiment of the present invention is further described, including the trestle main body 1, and also includes a full-width trolley 2, a full-width inverted arch formwork 3, an integral central groove formwork 4, an inverted arch layer sealing formwork 5, and a filling layer sealing formwork 6;

[0036] The full-width trolley 2 walks along the trestle main body 1 through the motor, and the oil cylinder at the bottom of the full-width trolley 2 is connected to the full-width inverted arch template 3 through the ear plate 9, which is the connection and driving mechanism between the trestle main body 1 and the full-width inverted arch template 3.

[0037] The arc shape of the full-width inverted arch formwork 3 completely fits the excavated tunnel section. The full-width inverted arch formwork 3 is composed of an arc formwork group 31, a hoop beam 32, and a longitudinal beam 33; the arc formwork group 31 is arranged on the hoop ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a full-width inverted arch formwork based on a tunnel trestle and an integrated construction method, and belongs to the technical field of tunnel inverted arch trestles. The full-width inverted arch formwork comprises a trestle body, a full-width trolley, a full-width inverted arch formwork body, an integral central groove formwork, an inverted arch layer end sealing formwork and a filling layer end sealing formwork. The full-width trolley performs self-walking along the trestle body through a walking device, and an oil cylinder at the bottom of the full-width trolleyis connected with the full-width inverted arch formwork body through a lug plate and is a connection and driving mechanism between the trestle body and the full-width inverted arch formwork body. Thefull-width inverted arch formwork has the advantages that the inverted arch construction is more standard, the inverted arch formwork body is not provided with a long longitudinal beam, a backend driver is not provided, and the formwork is simpler; an inverted arch layer and a filling layer are constructed in a same construction area, the construction progress is greatly accelerated, the construction efficiency is improved, the labor intensity is reduced, and the personnel input is reduced; and the construction quality is guaranteed, the safety of tunnel construction is guaranteed, and variousinverted arch construction working conditions are suitable.

Description

technical field [0001] The invention relates to a full-width inverted arch formwork based on a tunnel trestle bridge and an integrated construction method, belonging to the technical field of tunnel inverted arch trestle bridges. Background technique [0002] With the continuous development of my country's railway tunnel construction technology, in order to effectively improve the stability and durability of the inverted arch structure and realize the full-width construction of the inverted arch at one time, the full-width pouring construction has become the basic requirement for tunnel construction. Traditional full-width inverted arch formwork construction Generally, small pieces of steel molds are used in combination. Manual assembly, disassembly, and reinforcement consume a lot of manpower and material resources, and cannot be lifted and moved as a whole; resulting in long construction time, at least four people and four hours for a single assembly, and demolition. It also...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E21D11/10E01D15/10
CPCE21D11/10E21D11/102E01D15/10
Inventor 王亚波程波郑怀臣毛成宝张维颂
Owner HUNAN WUXIN MACHINERY