Panel unwatering method
A panel and dredging technology, which is used in earth-moving drilling, mining equipment, safety devices, etc., can solve the problems of large dredging investment, unfavorable mining operations, and long dredging and drainage time. Mining work environment, the effect of promoting maximum recovery
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0057] The panel drying method provided in this embodiment includes:
[0058] S11 divides the mine into multiple panels;
[0059] S12 survey the groundwater recharge direction of the panel to obtain the groundwater recharge direction;
[0060] In S13, the veins intersecting the groundwater supply direction in the panel area are used as the dredging and intercepting roadways.
[0061] In this embodiment, the panel is designed with multiple veins intersecting the direction of groundwater supply in the panel (the extension direction of the vein and the direction of groundwater supply form an acute or obtuse angle, or both are perpendicular), then the panel is used to be closest to the direction of groundwater supply The river vein is used as the dredging and intercepting roadway, and the dredging chamber and the draining borehole are arranged in the roadway. The extension direction of the draining borehole is opposite to or intersects with the groundwater supply direction, and t...
Embodiment 2
[0086] The panel drying method provided in this embodiment includes:
[0087] S21 divides the mine into multiple panels;
[0088] S22 survey the groundwater recharge direction of the panel to obtain the groundwater recharge direction;
[0089] S23 survey the ore body boundary of the panel to obtain the ore body boundary of the panel;
[0090] S24 survey the water-rich characteristics of the ore bodies in the panel to obtain the water-rich characteristics of the ore bodies in the panel;
[0091] S25 Combining the groundwater recharge direction of the panel, the ore body boundary of the panel and the water-rich characteristics of the ore body of the panel, carry out excavation design, so that at least one of the multiple mining roadways intersects the groundwater recharge direction ;
[0092] S26 Use one of the at least one mining roadway as a draining and intercepting roadway.
[0093] In this embodiment, the panel area is surveyed to obtain the direction of groundwater sup...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com