Ecological permeable spur dike system
A spur dam and ecological technology, applied in the field of ecological permeable spur dam system, can solve the problem of not improving the water quality and ecology of the river, and achieve the effects of improving the water quality of the river, reducing the amount of excavation and promoting growth.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0028] The structure of embodiment 1 permeable spur dam system
[0029] Such as Figure 1~3 As shown, the ecological permeable spur system of the present invention includes at least one permeable spur, and the permeable spur extends from the river bank to the channel, and the permeable spur includes a pile unit, a nutrient-adsorbing unit and a plant unit, and the pile unit It includes a plurality of wooden piles 1 arranged at intervals in sequence; the nutrient-rich adsorption unit is arranged between two adjacent wooden piles, and the nutrient-rich adsorption unit includes a variety of mixed fillers 2 that can absorb and enrich nutrients The plant unit is planted on the upper part of the eutrophic adsorption unit, and the plant unit includes at least one aquatic plant 3 .
[0030] The ecological permeable spur dike of the present invention can be a first-level ecological permeable spur dike consisting of one permeable spur dime, or a third-level ecological permeable spur dik...
Embodiment 2
[0036] The water body purification effect of embodiment 2 permeable spur dikes
[0037] 1. Comparing the water purification effect of the third-level ecological permeable spur dam and the first-level ecological permeable dam
[0038] Three prefabricated ecological permeable spur dams are placed equidistantly in the simulated river, the water level is 5cm, the dam length is 1 / 4 or 1 / 2 the river width, the dam length of the first-level ecological permeable dam is the same as the river width, and the artificially simulated river water is Simulate one-time flow in the river. The sampling sections are set at 5cm in front and behind the dams of spur dikes at all levels, and the water outlet is 1 meter away from the last section. The sampling interval is 12 hours, and the analysis is completed within 24 hours after the sampling.
[0039] Specific results such as Figure 4 The results show that the removal rate of TN, TP, ammonia nitrogen and COD of the first-level ecological perme...
PUM
Property | Measurement | Unit |
---|---|---|
diameter | aaaaa | aaaaa |
particle diameter | aaaaa | aaaaa |
clearance rate | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com