A semi-enclosed outer scaffolding top floor safety construction channel
A technology for external scaffolding and construction passages, which is applied to the accessories of scaffolding, buildings, and housing structure supports, etc. It can solve problems such as hidden safety hazards and poor continuity, and achieve the effects of avoiding gaps, improving construction convenience, and improving safety factors
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0042] Such as Figure 1-10 Among them, a semi-enclosed outer scaffold top floor safety construction passage, including scaffolding, protective boards, safety bars 5, and carrying devices 6, the scaffolding includes a plurality of first fixed rods 1, a plurality of second fixed rods 2 and scaffolding Fasteners, the top of the first fixed rod 1 is provided with a protective plate, the protective plate is provided with a safety bar 5, and a plurality of second fixed rods 2 on the top floor are provided with a plurality of carrying devices.
[0043] In a preferred solution, the protective plate includes a first protective plate 3 and a second protective plate 4, the first protective plate 1 includes a first frame body 7, and the first frame body 7 is connected to the fixed hook 10 through the first pin shaft 11 connection, the first frame body 7 is connected with the second frame body 8 through the second pin shaft 15, the first frame body 7 is provided with a plurality of fixing...
Embodiment 2
[0054] Such as Figure 1-10 Among them, a method for setting a safe construction passage on the top floor of a semi-enclosed external scaffold includes the following steps:
[0055] Step 1: Install the carrying device 6 between the row of second fixed rods 2 on the top floor of the outer scaffold, hang on the second fixed rod 2 through the first hanging ring 30 and the second hanging ring 31, and arrange the carrying device 6 continuously , the first hanging ring 30 is hung on the second hanging ring 21;
[0056] Step 2: According to the size of the gap between the first carrying plate 28 and the second carrying plate 29 when the carrying device 6 is fixed, choose whether to place a bearing plate on the carrying device 6;
[0057] Step 3: Then according to the overall length of the outer scaffold, use two first protective plates 3 and any number of second protective plates 4 to splice. The widths of the first protective plates 3 and the second protective plates 4 are the same...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com