Air conditioning pipeline mounting assembly and using method thereof
A technology for installing components and air conditioning pipelines. It is applied in the directions of pipes/pipe joints/fittings, pipe supports, mechanical equipment, etc. It can solve problems such as pipe wear and refrigerant leakage, reduce wear, prevent leakage, and improve safety and reliability. sexual effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0021] Example 1, combining Figure 1 to Figure 3 , An air-conditioning pipeline installation assembly, comprising a mounting plate 1 and a pipe clamp 2. The mounting plate 1 is an L-shaped structure formed by bending a metal plate, and includes a vertical part 11 and a horizontal part 12. The vertical part of the mounting plate 1 On both sides of the straight portion 11, two first mounting holes 111 are symmetrically opened. The axis of the mounting bolt is perpendicular to the horizontal part of the mounting plate 1. On both sides of the bottom of the horizontal part 12 of the mounting plate 1, two mounting bolts 3 are symmetrically arranged, and the two mounting bolts 3 are perpendicular to the horizontal part 12 of the mounting plate 1, and the upper ends of the mounting bolts 3 are fixedly welded to the mounting plate 1 As a whole, the mounting bolt 3 is equipped with a lock nut 4. Each mounting bolt 3 is detachably fixedly installed with a pipe clamp 2, and the function...
Embodiment 2
[0024] Example 2, combining image 3 with Figure 4 , A method of using air-conditioning pipeline installation components, which is mainly applied to the installation of air-conditioning pipelines of construction machinery. It includes the following steps: Step one: Place a fixing bolt in the two first mounting holes 111 of the mounting plate 1, respectively, Fix the mounting plate 1 on the car body. Step two, place the air-conditioning pipe 6 in the oblong hole 2 of the pipe clamp 2, and then install the first connection end 23 and the second connection end 24 of the pipe clamp 2 to the corresponding mounting bolt 3. In step 2, pass one end of the air conditioning pipe 6 through the long round hole of the pipe clamp. Step 3: Put the spring washer 5 on the mounting bolt 3 and screw in the lock nut 4, adjust the direction of the pipe clamp 2, tighten the lock nut 4, and complete the fixing of the pipe clamp 2 and the air conditioning pipe 6 on the mounting plate 1. .
Embodiment 3
[0025] Example 3, combined image 3 with Figure 4 , A method of using air-conditioning pipeline installation components, which is mainly applied to the installation of air-conditioning pipelines of construction machinery. It includes the following steps: Step one: Place a fixing bolt in the two first mounting holes 111 of the mounting plate 1, respectively, Fix the mounting plate 1 on the car body. Step two, place the air-conditioning pipe in the oblong hole 2 of the pipe clamp 2, and then install the first connection end 23 and the second connection end 24 of the pipe clamp 2 to the corresponding mounting bolt 3. In the second step, the first connection end and the second connection end of the pipe clamp are separated, and the air-conditioning pipe is put into the long round hole of the pipe clamp between the first connection end and the second connection end. Step 3: Put the spring washer 5 on the mounting bolt 3 and screw in the lock nut 4, adjust the direction of the pipe ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


