Short-term load prediction method and device for power system and terminal equipment
A technology for short-term load forecasting and power system, applied in the field of power system to achieve the effect of improving forecasting accuracy, reducing dependence, and avoiding poor adaptability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0024] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.
[0025] Please refer to figure 1 , figure 1 It is a schematic flowchart of a short-term load forecasting method for a power system provided by an embodiment of the present invention. The method includes:
[0026] S101: Obtain the input variable of the observation day and perform preprocessing on the input variable of the observation day.
[0027] In this embodiment, in order to obtain more accurate data, it is necessary to perform preprocessing on the input variables of the observation day, wherein the preprocessing includes denoising processing and outlier remov...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


