Prefabricated bearing platform and pier
A technology for prefabricating caps and piers, applied in bridges, bridge parts, bridge construction, etc., can solve the problems of narrow construction access roads, inability to hoist large-volume caps, and large terrain fluctuations.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] Such as figure 1 and 2 As shown, a prefabricated platform provided by the present invention includes: a plurality of independent platform units; a plurality of said platform units can be stacked one after another, and two adjacent said platform units can be fixedly connected ; The platform unit on one side is provided with a connecting structure for connecting with the foundation pile 300 ;
[0032] Wherein, the number of independent cap units is adjusted according to specific construction conditions.
[0033] In this embodiment, the weight of each independent cap unit will be relatively reduced, so that the small hoisting equipment can fix the cap unit on one side to the foundation pile through the connecting structure provided thereon, and then The other cap units are hoisted on top of the first cap unit, so that multiple independent cap units can be quickly superimposed one by one through hoisting, and then connected to each other, so that the cap part can be quick...
Embodiment 2
[0056] Such as Figure 6 As shown, another object of the present invention is to provide a bridge pier comprising the prefabricated cap as described above. The effect of the bridge pier is the same as that of the prefabricated cap, and will not be repeated here.
[0057] Further, the bridge pier also includes a column 400, a plurality of grouting sleeves 410 are evenly distributed under the column 400, and a set of grouting sleeves 410 is provided above the uppermost platform unit 200 to cooperate with the grouting sleeves 410. The connecting steel bar 260.
[0058] In this embodiment, the connecting steel bar 260 is arranged above the upper cap unit 200 , and the connecting steel bar 260 is connected with the grouting sleeve below the column 400 , so as to realize the construction of the entire pier.
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


