A mobile support for tunnel length photogrammetry
A technology of photogrammetry and tunnel length, applied in the field of mobile brackets, can solve the problems of high labor intensity, arm soreness, and heavy photogrammetry, and achieve the effects of reducing labor intensity, facilitating adjustment, and preventing arm soreness.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0018] A mobile stand for tunnel length photogrammetry such as Figure 1-3 As shown, it includes a bracket 1, a support plate 2, a bearing 3, a rotating shaft 4, a first support plate 5, a sliding rod 7, a sliding sleeve 8, a fixing device 9, a first connecting rod 10, a fixing plate 11, and a second connecting rod 12. The first gear 13, the second gear 14, the second swing lever 15, the fixed frame 16 and the roller 17, the left and right sides of the lower part of the support plate 2 are connected with the support 1 in a rotational manner, and the top of the support plate 2 is embedded with a bearing in the middle 3. A rotating shaft 4 is installed inside the bearing 3, and the top of the rotating shaft 4 is fixedly connected with the first supporting plate 5 which plays a role of holding. The rotating shaft 4 is connected to the first supporting plate 5 by welding. There are grooves 6 on the sides, and a sliding rod 7 is fixed on the top of the groove 6. A sliding sleeve 8 ...
Embodiment 2
[0020] A mobile stand for tunnel length photogrammetry such as Figure 1-3 As shown, it includes a bracket 1, a support plate 2, a bearing 3, a rotating shaft 4, a first support plate 5, a sliding rod 7, a sliding sleeve 8, a fixing device 9, a first connecting rod 10, a fixing plate 11, and a second connecting rod 12. The first gear 13, the second gear 14, the second swing lever 15, the fixed frame 16 and the roller 17, the left and right sides of the lower part of the support plate 2 are connected with the support 1 in a rotational manner, and the top of the support plate 2 is embedded with a bearing in the middle 3. A rotating shaft 4 is installed in the bearing 3, and the top of the rotating shaft 4 is fixedly connected with the first support plate 5 which plays a role of holding, and the inner surfaces of the left and right two brackets 1 are provided with grooves 6, and the tops in the grooves 6 are fixed There is a slide bar 7, on the slide bar 7 there is a sliding slee...
Embodiment 3
[0023] A mobile stand for tunnel length photogrammetry such as Figure 1-3 As shown, it includes a bracket 1, a support plate 2, a bearing 3, a rotating shaft 4, a first support plate 5, a sliding rod 7, a sliding sleeve 8, a fixing device 9, a first connecting rod 10, a fixing plate 11, and a second connecting rod 12. The first gear 13, the second gear 14, the second swing lever 15, the fixed frame 16 and the roller 17, the left and right sides of the lower part of the support plate 2 are connected with the support 1 in a rotational manner, and the top of the support plate 2 is embedded with a bearing in the middle 3. A rotating shaft 4 is installed in the bearing 3, and the top of the rotating shaft 4 is fixedly connected with the first support plate 5 which plays a role of holding, and the inner surfaces of the left and right two brackets 1 are provided with grooves 6, and the tops in the grooves 6 are fixed There is a slide bar 7, on the slide bar 7 there is a sliding slee...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


