A multi-hop relay configuration method, equipment and device
A multi-hop relay and configuration method technology, applied in wireless communication, electrical components, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0123] In this example, the implementation description of the link establishment process will be carried out.
[0124] Figure 5 Implement a flow diagram for the path configuration process, as shown in the figure, which may include:
[0125] Step 501, DgNB sends path configuration command to RN8 via RN7;
[0126] Step 502, RN8 returns a path configuration response to DgNB via RN7.
[0127] The specific process can be as follows:
[0128] 1: RN8 accesses the network as a UE after it is turned on, and selects RN7 to access the network according to the cell selection criteria (standard) during the network access process.
[0129] 2: Since RN7 does not have an RRC (Radio Resource Control, radio resource control) function, the RRC of the DgNB configures measurement for RN8, and RN8 performs measurement reporting to RN7 and RN2. , that is: during implementation, on the DgNB side, the DgNB may configure the measurement of the second RN and the third RN for the first RN through th...
Embodiment 2
[0134] In this example, the implementation of the link restoration process will be described.
[0135] As described in Embodiment 1, currently RN8->RN2->DgNB is an active link, and RN8->RN7->DgNB is a standby link.
[0136] Method 1:
[0137] It is assumed that the RN8->RN2 link is interrupted, and RN8 initiates the activation of the backup link, and activates the link deletion process.
[0138] That is, during implementation, when the active relay link path is interrupted, it may further include:
[0139] activate an alternate trunk link path; and / or,
[0140] Delete the active trunk link path.
[0141] Image 6 It is a schematic diagram of the implementation process of mode 1 in the case of link interruption, as shown in the figure, which may include:
[0142] Step 601, RN8 sends a request for activating a backup path to DgNB via RN7;
[0143] In step 602, the DgNB returns an acknowledgment of activating the standby path to RN8 via RN7.
[0144] In an implementation, ...
Embodiment 3
[0174] In this embodiment, the UE has multiple active links at the same time, and the UE can freely select any link for transmission. That is, it is implemented when there are multiple active relay link paths and multiple backup relay link paths. In this case:
[0175] On the DgNB side, when there are at least two activated relay link paths, further include:
[0176] discarding excess data when the same data is transmitted on each active relay link path; and / or,
[0177] When the data transmitted on different activated relay link paths are different, the different data are combined and then restored.
[0178] On the access RN side, when there are at least two activated relay link paths, further include:
[0179] transmit the same data on each active trunk link path; and / or,
[0180] After the data is divided into different parts, it is transmitted on different active relay link paths.
[0181] Specifically, the RN can perform two types of sending on multiple links:
[0182...