Assembly type floor and installation method thereof
An installation method and assembly method technology, applied in the direction of floor, covering/lining, insulation layer, etc., can solve the problems of heavy on-site workload, time-consuming and labor-consuming, decay and damage of wooden keels, etc., so as to improve installation efficiency and reduce cumbersomeness Steps, the effect of reducing workload
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0041] like Figure 1~7 As shown, a prefabricated floor, which includes:
[0042] A keel 1, the keel 1 is provided with a card slot 2;
[0043] The floor body 3, the lower end of the floor body 3 is provided with a notch 4;
[0044] A connecting piece, the connecting piece is used to snap into the card slot 2 and the notch 4 to connect the keel 1 and the floor body 3 .
[0045] In this embodiment, in order to make the keel 1 moisture-proof, waterproof, moisture-proof, etc., the keel 1 is a metal keel.
[0046] In this embodiment, two card slots 2 are arranged side by side on the keel 1, and one card slot 2 is used to be locked with a connecting piece mounted on a row of floor bodies 3 in two adjacent rows of floor bodies 3 The other card slot 2 is used for snap-fitting with a connecting piece mounted on another row of floor bodies 3 in two adjacent rows of floor bodies 3 .
[0047] Specifically, the present invention connects the floor body 3 and the keel 1 by connecting t...
Embodiment 2
[0058] A method for installing a prefabricated floor, the method steps comprising:
[0059] Lay the keels 1 at appropriate intervals and fix them on the ground 10;
[0060] First, the connector is inserted into the notch 4 of the floor body 3 , and then the connector is inserted into the slot 2 of the keel 1 fixed on the ground 10 .
[0061] Specifically, the method for snapping the connector into the notch 4 of the floor body 3 includes:
[0062] Insert the oblong base into the bottom of the inverted convex groove and rotate 90°.
[0063] In this embodiment, before the keel 1 is laid on the ground 10, the method steps also include:
[0064] Sweep the ground 10, and lay a moisture-proof film on the ground 10.
[0065] Specifically, this installation method is relatively simple, greatly reduces the workload on site, and the installation is firm.
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com



