Building construction intelligent management method and system based on Internet of Things
A technology of construction intelligence and intelligent management, applied in general control systems, control/regulation systems, comprehensive factory control, etc., can solve problems such as low productivity efficiency and poor management of construction site resources, and achieve the goal of improving productivity efficiency and realizing intelligent management. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0022] Such as figure 1 As shown, Embodiment 1 of the present invention provides an intelligent management method for building construction based on the Internet of Things, comprising the following steps:
[0023] S1. Collect historical energy consumption data and corresponding historical production capacity data of the construction site, and obtain a relationship model between energy consumption and production capacity according to the historical energy consumption data and historical production capacity data;
[0024] S2. Obtain real-time energy consumption data, and calculate theoretical production capacity data according to the real-time energy consumption data and the relationship model;
[0025] S3. Obtain real-time production capacity data, compare the real-time production capacity data and theoretical production capacity data, and judge whether the energy-saving standard is met, and give an energy-saving reminder if not.
[0026] The present invention firstly fits the...
Embodiment 2
[0049] Such as figure 2As shown, Embodiment 2 of the present invention provides an intelligent management system for building construction based on the Internet of Things, including a data acquisition node 1, an acquisition terminal 2, a remote server 3, and an intelligent terminal 4; terminal 4;
[0050] The data collection node 1 is used to collect historical energy consumption data and corresponding historical production capacity data of construction sites;
[0051] The collection terminal 2 is used to upload the historical energy consumption data and corresponding historical production capacity data to the remote server 3;
[0052] The remote server 3 is used to obtain a relationship model between energy consumption and production capacity by fitting according to the historical energy consumption data and historical production capacity data;
[0053] The data collection node 1 is also used to obtain real-time energy consumption data and real-time production capacity dat...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


