Pile bottom grouting cavity and use method, and poured pile body and construction method of poured pile body
A technology of grouting cavity and cast-in-place pile, which is applied in the direction of sheet pile wall, foundation structure engineering, building, etc. It can solve the problems of excessive sediment, affecting construction quality, and hole wall collapse, so as to prevent hole wall collapse, improve construction quality and progress effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0086] The cast-in-place pile provided in this embodiment, such as Figure 4 and Figure 5 shown, which includes:
[0087] Pile bottom grouting cavity, such as Figures 1 to 3 shown, which includes:
[0088] A fixed plate 4, the fixed plate 4 is provided with a passage hole 5 communicating with the bottom of the accommodating hole 1 for the mud and sediment in the accommodating hole 1 to pass through the fixed plate 4. There is one hole 5, which is arranged at the central position of the fixing plate 4, and the fixing plate 4 forms an annular plate-shaped structure. Through the passage hole 5 set in the center of the fixed plate 4, when the grouting cavity at the bottom of the pile sinks toward the bottom of the accommodation hole 1, the mud water and air in the accommodation hole 1 will enter through the passage hole 5. Above the grouting cavity at the bottom of the pile, no vortex that damages the hole wall will be formed between the grouting cavity at the bottom of the ...
Embodiment 2
[0116] The difference between this embodiment and embodiment 1 is that, as Figure 7 As shown, the grouting structure is used to inject grout into the passage hole 5 and the inner ring space of the annular grouting capsule 2 , and the grouting structure is two grouting pipes 17 . The fixing plate 4 has a slurry storage chamber 19 communicating with the passage hole 5 , and the slurry replenishing pipe 17 is in communication with the slurry inlet 21 of the slurry storage chamber 19 . The grout feeding pipe 17 is provided with a second one-way valve for controlling the connection or disconnection between the grout feeding pipe 17 and the passage hole 5 . By injecting grout to the bottom of the pile through the through hole 5 through the grouting structure, the cement slurry content at the bottom of the pile can be effectively increased, and the quality of the concrete at the bottom of the pile can be improved. The grouting in the passing hole 5 has the following advantages: 1. ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


