A panel and column technology, which is applied in the field of maintaining the alignment of the column panels of the fence, can solve the problems of reducing construction quality, reducing construction efficiency, and dimensional accuracy cannot be guaranteed, so as to improve the shape accuracy of the column, ensure smooth construction, fast and reliable docking Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0035] The present invention will be further described in detail below in conjunction with a specific embodiment of the construction of a wall column that adopts the method of the present invention.
[0036]During concrete implementation: a kind of wall column construction scheme that has adopted the inventive method, comprises the following steps: a excavation foundation pit, digs out foundation pit downwards along column design position with the depth exceeding 800cm downwards, foundation pit upper end ground Excavate a sinker at the center of the foundation pit, and set a layer of crushed stone cushion at the bottom of the foundation pit; b. After the foundation pit is dug, the foundation is poured. During pouring, two vertical rows of steel bars are pre-buried in the foundation, and the two vertical rows of steel bars are arranged along the front and rear directions. The upper ends of the two vertical rows of steel bars are exposed at intervals on the left and right and ser...