Construction method of bridge prestress continuous box girder
A construction method and prestressing technology, applied in bridges, bridge materials, bridge construction, etc., can solve problems affecting bridge quality and complexity, achieve good market prospects, less reinforcement, and eliminate influencing factors
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0023] The technical solutions provided by the present invention will be described in detail below in conjunction with specific examples. It should be understood that the following specific embodiments are only used to illustrate the present invention and are not intended to limit the scope of the present invention.
[0024] The invention provides a construction method of bridge prestressed continuous box girder, the method is as follows:
[0025] (1) Foundation treatment;
[0026] If the foundation is located in a place that can meet the bearing capacity requirements, no foundation treatment is required; if the foundation is located in a soft soil area, the silty soil should be excavated first, and the permeable material should be replaced by layered backfill. After the filling is completed, compact it with a road roller, and then lay a gravel cushion and pour concrete.
[0027] (2), support erection and preloading;
[0028] Use a total station to release the center line of...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com