A Construction Method for Excavating a Foundation Pit Near a Deep-buried Large-diameter Pipeline
A construction method and large-diameter technology, applied in excavation, infrastructure engineering, construction, etc., can solve problems such as high leakage risk, deformation and cracking of pipelines, and close pipelines, and achieve the effect of ensuring safety
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0032] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments. Unless otherwise specified, the instruments or materials used in the present invention are commercially available.
[0033] Such as Figures 1 to 9 As shown, a construction method of the present invention for excavating a foundation pit near a deep-buried large-diameter pipeline, the construction process is: excavation of the first foundation pit 3 outside the area affected by the pipeline 1 → the second foundation pit 4 in the area affected by the pipeline 1 Excavation of the first layer 41 of the second foundation pit, the second layer 42 of the second foundation pit, and the first layer 51 of the third foundation pit of the third foundation pit 5 and the second layer 52 of the third foundation pit → pipeline 1 second The third layer 43 of the foundation pit is excavated in sections, and the fourth layer 44 of the second foundation p...