A method of installation and construction of centralized air supply and exhaust system units
A construction method, air supply and exhaust technology, applied in the direction of safety devices, earthwork drilling, mining equipment, etc., can solve the problems of limited working space, long construction period, low work efficiency, etc., to improve installation accuracy, save processing costs, The effect of improving productivity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0029] A centralized air supply and exhaust system unit installation construction method includes the following steps.
[0030] S100~Establish a data model to determine the structure size;
[0031] S101~Measure the installation space of each unit in the fan room, and check the size and spacing of the air inlet and outlet;
[0032] S102~Clarify the size of each structural component of each unit, and measure the foundation and fixed point data in the fan room;
[0033] S103 ~ According to the measurement data and unit size data, use drawing software to make a unit model, reserve 15cm space before and after the main unit, adjust and determine the installation position of each component, and evenly distribute the remaining space to the air inlet and outlet between the air valve and the muffler Damper, determine the size of the damper at the air inlet and outlet.
[0034] S200~calculate the structural size according to the modeling in step S100, and construct symmetrically from b...