A construction method of arch-connected tunnel with small clear distance in mountainous area
A technology for expressway and tunnel construction, which is applied to tunnels, tunnel linings, earthwork drilling and mining, etc. It can solve the problems of difficult construction and many bridges connected to tunnels, and achieve the effect of simple construction methods, less interference, and clear ideas
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment example 1
[0039] Implementation case 1: A construction method for a small clear distance tunnel connected by arches on a mountain expressway, in which area A is the first construction branch hole, and area B is the hole used to connect the first construction branch hole and the right side of the split section opening Body section, area C is the second construction branch hole, area D is the body section used to connect the second construction branch hole and the left hole separated section opening, and area E is used to connect the first construction branch hole and the right hole with the arch section The ultra-small clear distance section and the small clear distance section, the F area is the middle pilot tunnel of the connecting arch section, the G area is the connecting arch section of the right hole, and the H area is the ultra-small space used to connect the second construction support tunnel and the connecting arch section of the left hole. The small clear distance and the small ...
Embodiment example 2
[0058] Implementation case 2: The separate section adopts a separate lining structure, the small clear distance section adopts a small clear distance lining structure, and the multi-arch section adopts a multi-arch lining structure. In the left line H area, the clear distance is less than 6m. The non-joint arch section is excavated with a milling machine or a cantilever roadheader. The weakest part of the small clear distance tunnel is the middle rock wall, and the damage of the middle rock wall starts from the arch waist position on the side of the leading hole. Therefore, the middle rock wall is the focus of the monitoring and measurement of the small clear distance tunnel, and the focus of the monitoring and measurement of the middle rock wall is the position of the arch waist on the side of the leading hole.
[0059] In the ultra-small clear distance non-joint arch section with clear distance less than 6m in the left line H area, the blasting rate should be controlled durin...
Embodiment example 3
[0060] Implementation case 3: The tunnel excavation method is selected according to the geological conditions, and the excavation method is adjusted according to the deformation convergence.
[0061] In order to facilitate the assembly of the secondary lining trolley, the excavation clearance in the main hole of the secondary lining trolley is expanded by 50cm, and the secondary lining concrete of the same level is used for backfilling.