Step-by-step unloading device and construction method of single-point support butt joint of long-span space pipe truss
A single-point support and unloading device technology, which is applied in the on-site preparation of pillars and building components, and the processing of building materials. The effect of control, fast construction progress, high synchronization and stability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0091] Example 1: Yulin City Sports Center (Gymnasium) steel structure project
[0092] The project is located in the Southwest New District of Yulin City. The stadium will be the main venue for the 17th Shaanxi Provincial Games in 2022. The construction area of the gymnasium is about 23846.9 ㎡, the projected area of the steel structure canopy is about 11054.4 ㎡, and the structure height is 29.45m. The span of the steel roof is about 70m, and it adopts a space circular tube truss structure. There are 5 trusses in total, arranged in parallel along the span direction, and the distance between each truss is 16.8m. The truss is made of round steel pipes, the joints are intersecting, the cross section is triangular, the width is 8.4m, and the sagittal height is 3~6m. The truss rests on the top of the surrounding concrete columns, supported by the upper chord, and the support adopts the anti-pull basin support. The amount of steel used for the steel structure is about 1,400 to...
Embodiment 2
[0109] Example 2: Yulin City Sports Center (swimming pool) steel structure project
[0110] The project is located in the Southwest New District of Yulin City. The stadium will be the main venue for the 17th Shaanxi Provincial Games in 2022. The construction area of the swimming pool is about 23846.9 ㎡, the projected area of the steel structure canopy is about 11812.5 ㎡, and the structure height is 22.7m. The span of the steel roof is about 60m, and it adopts a space circular tube truss structure. There are 13 trusses in total, arranged in parallel along the span direction, and the distance between each truss is 9m. The truss nodes adopt intersecting connections, the section is triangular, the width is 4.5m, and the truss height is 2.4~3.5m. The south side of the roof is overhanging, with a length of about 12m. The truss rests on the top of the surrounding concrete column, and the lower chord is supported, and the support adopts the basin type support. The amount of ste...
Embodiment 3
[0111] Example 3: Yulin City Sports Center (Stadium) Steel Structure Project
[0112] The project is located in the middle of the Southwest New District of Yulin City, at the junction of Yuyang District and Hengshan District, with four roads: Yuheng 8th Road in the north, Huaiyuan 13th Street in the west, Yuheng 9th Road in the south, and planned land on the east side of the base. The start date is July 15, 2019, and the completion date is May 1, 2020. The steel structure engineering volume of this project is about 7,500 tons, and there are 112 sets of pipe truss blocks. Efficiency, excellent quality, safety and reliability.
PUM