Method for selecting erection position of temporary building
A temporary building and building technology, applied in the field of temporary construction projects, can solve the problems of inconvenient use, poor lighting and poor stability for construction personnel
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0034] Such as figure 1 As shown, the erection position selection method of the temporary building of the present embodiment comprises:
[0035] Step 1: Establish a 3D model of the engineering site on the computer;
[0036] Step 2: building a three-dimensional model of the temporary building on the three-dimensional model;
[0037] Step 3: find out in the 3D model of the project site all areas whose volume is greater than or equal to the volume of the 3D model of the temporary building;
[0038] Step 4: Import the illumination, slope and hydrology information of all areas in step 3, and select the areas that meet the illumination, slope and hydrology required by the temporary building;
[0039] Step 5: Import the area required by road planning and municipal planning in the area that meets the lighting, slope and hydrology of the temporary building screened in step 4. After filtering out the area required by road planning and municipal planning, the volume is greater than or ...
Embodiment 2
[0053] The difference between this embodiment and Embodiment 1 is that in this embodiment, in the step 1, the volume parameters of all construction buildings are imported, and the three-dimensional model of the engineering site with all three-dimensional models of construction buildings is established. This method is adopted , can start from the overall project progress, so that the location selection of the temporary building will consider the positions of all construction buildings, thereby reducing the number of times the temporary building needs to be rebuilt. This embodiment can also achieve the technical effect of the first embodiment.
Embodiment 3
[0055] The difference between this embodiment and Embodiment 1 is that, if figure 2 As shown, in this embodiment, after step 6 is executed, step 7 is executed: in the area that satisfies the erection conditions of the temporary building, the temporary building is erected in the area closest to its volume. Using this method, the temporary building can be optimized The erection area of the building enables more temporary buildings to be erected in the erection area of the temporary building. This embodiment can also achieve the technical effect of the first embodiment.